应该重新规划吗?学习在鲁棒MAPF执行中找到合适的时间

Should I Replan? Learning to Spot the Right Time in Robust MAPF Execution

Czech Institute of Informatics, Robotics and Cybernetics, Czech Technical University in Prague(捷克理工大学捷克斯洛伐克信息学、机器人与自动化研究所);Faculty of Electrical Engineering, Czech Technical University in Prague(捷克理工大学电气工程学院)

David Zahrádka, David Woller, Denisa Mužíková, Miroslav Kulich, Libor Přeučil

AI总结:

本文提出利用全连接前馈神经网络预测延迟代理下的重新规划收益,通过设计基于ADG的特征描述鲁棒执行状态及潜在延迟影响,以减少延迟带来的影响。

摘要:

在现实应用中执行多智能体路径规划(MAPF)计划时,MAPF假设车队运动完全同步的假设不成立。由于一个或多个智能体可能因内部或外部因素延迟,需要使用鲁棒执行方法以避免因不同步导致的碰撞。鲁棒执行方法如动作依赖图(ADG)同步执行高风险动作,但通常以增加计划执行成本为代价,因为可能需要某些智能体等待延迟的智能体。在这种情况下,通过寻找新计划(通过重新调度或更通用的重新规划)可以在保持安全的同时减少执行成本。然而,这些操作可能成本高昂,且新计划可能不会比原计划有更低的执行成本:例如,两个计划可能完全相同。因此,我们估计在存在延迟智能体的场景中,通过单次重新规划所能获得的收益,使用一个完全连接的前馈神经网络。神经网络的输入是一组新设计的基于ADG的特征,描述鲁棒执行的状态和潜在延迟的影响,输出是通过重新规划可实现的估计收益。我们在一个包含12,000个实验的新标注数据集上训练和测试网络,并证明所提出的方法能够将延迟的影响减少高达可实现减少的94.6%。

英文摘要:

During the execution of Multi-Agent Path Finding (MAPF) plans in real-life applications, the MAPF assumption that the fleet's movement is perfectly synchronized does not apply. Since one or more of the agents may become delayed due to internal or external factors, it is often necessary to use a robust execution method to avoid collisions caused by desynchronization. Robust execution methods - such as the Action Dependency Graph (ADG) - synchronize the execution of risky actions, but often at the expense of increased plan execution cost, because it may require some agents to wait for the delayed agents. In such cases, the execution's cost can be reduced while still preserving safety by finding a new plan either by rescheduling (reordering the agents at crossroads) or the more general replanning capable of finding new paths. However, these operations may be costly, and the new plan may not even lead to lower execution cost than the original plan: for example, the two plans may be the exact same. Therefore, we estimate the benefit that can be achieved by single replanning in scenarios with delayed agents given an immediate state of the execution with a fully connected feed-forward neural network. The input to the neural network is a set of newly designed ADG-based features describing the robust execution's state and the impact of potential delays, and the output is an estimated benefit achievable by replanning. We train and test the network on a new labeled dataset containing 12,000 experiments, and we show that our proposed method is capable of reducing the impact of delays by up to 94.6% of the achievable reduction.