AI总结:

本文通过新的状态剪枝方法和基于加法组合学引理的交换论证,改进了Lawler-Moore动态规划框架,将运行时间从依赖总处理时间P改为依赖最大处理时间p_max^2,从而在特定条件下实现了更高效的算法。

摘要:

通过加法组合学实现Lawler-Moore加速的摘要指出,Lawler-Moore动态规划框架在并行机调度中是一个经典工具。它适用于目标函数为正则函数的情况,即在作业完成时间单调递增的情况下,每台机器遵循固定的优先级顺序,如Smith规则或Jackson规则。对于基本目标函数$Pm||\sum w_jC_j$、$Pm||L_{\max}$和$Pm||\sum w_jU_j$,它给出的运行时间分别为$O(P^{m-1}n)$、$O(P^{m-1}n)$和$O(P^mn)$,其中$P$是总处理时间。最近的基于SETH的下界表明,对$P$的依赖本质上是最佳的,但它们并不排除对最大处理时间$p_{\max}$的改进依赖。我们给出了Lawler-Moore递推关系的第一个重大加速。主要成分是一种新的状态剪枝方法和基于加法组合学引理的交换论证。我们证明,当这种交换不增加目标值时,存在一个最优调度,对于每个作业的前缀,任何两台机器之间的负载差异不超过$4p_{\max}^2$。这使得我们能够在整个动态规划过程中剪枝冗余状态,将对$P$的依赖替换为对$p_{\max}^2$的依赖。我们证明,对于上述三个目标函数,交换是非递增的。因此,$Pm||\sum w_jC_j$和$Pm||L_{\max}$允许在$O(p_{\max}^{2m-2}n)$时间内解决,而$Pm||\sum w_jU_j$可以在$O(p_{\max}^{2m-2}Pn)\le O(p_{\max}^{2m-1}n^2)$的时间内解决。这些界限在$p_{\max}=o(\sqrt{P})$时严格优于原始的Lawler-Moore运行时间。特别是,对于$Pm||\sum w_jC_j$和$Pm||L_{\max}$,当处理时间是$n$的对数多项式时,我们获得了第一个近线性时间算法。

英文摘要:

The Lawler-Moore dynamic programming framework is a classical tool in scheduling on parallel machines. It applies when the objective is regular, i.e. monotone in job completion times, and each machine follows a fixed priority order such as Smith's Rule or Jackson's Rule. For the basic objectives $Pm||\sum w_jC_j$, $Pm||L_{\max}$, and $Pm||\sum w_jU_j$, it gives running times $O(P^{m-1}n)$, $O(P^{m-1}n)$, and $O(P^mn)$, respectively, where $P$ is the total processing time. Recent SETH-based lower bounds indicate that the dependence on $P$ is essentially optimal, but they do not rule out improved dependence on the maximum processing time $p_{\max}$. We give the first major speedup of the Lawler-Moore recurrence. Our main ingredients are a new state-pruning method and a swapping argument based on an additive-combinatorial lemma. We prove that, whenever this swap does not increase the objective value, there exists an optimal schedule in which, for every prefix of jobs, the load difference between any two machines is at most $4p_{\max}^2$. This lets us prune redundant states throughout the dynamic program, replacing the dependence on $P$ by a dependence on $p_{\max}^2$. We show that the swap is non-increasing for all three objectives above. Hence $Pm||\sum w_jC_j$ and $Pm||L_{\max}$ admit algorithms with running time $O(p_{\max}^{2m-2}n)$, while $Pm||\sum w_jU_j$ can be solved in time $O(p_{\max}^{2m-2}Pn)\le O(p_{\max}^{2m-1}n^2)$. These bounds strictly improve the original Lawler-Moore runtimes whenever $p_{\max}=o(\sqrt{P})$. In particular, for $Pm||\sum w_jC_j$ and $Pm||L_{\max}$, we obtain the first near-linear-time algorithms when processing times are polylogarithmic in $n$.