迈向欧洲国家量子通信:规划与设计陆基QKD网络
Towards National Quantum Communication in Europe: Planning and Sizing Terrestrial QKD Networks
AI总结:
本文提出了一种可复现的规划方法,用于设计支持关键基础设施和公共当局的国家陆基QKD网络,通过蒙特卡洛模拟验证了奥地利案例,并推导出适用于其他欧盟国家的扩展规则。
摘要:
欧洲联盟正在开发欧洲量子通信基础设施(EuroQCI)作为跨成员国的网络,以提供安全通信能力,涵盖政府和关键基础设施领域。虽然战略目标已在欧盟层面定义,但所需规模和结构的国家量子密钥分发(QKD)网络仍 largely unspecified。本文探讨了如何规划和设计国家陆基QKD网络以支持关键基础设施和公共当局。我们提出了一种可复现的规划方法,该方法基于少量显式假设来估算网络规模、总光纤长度和所需QKD组件数量。该方法在奥地利进行了演示,构建了一个合成但结构化的网络模型,并通过蒙特卡洛模拟进行了评估。模型专注于陆基QKD基础设施,明确排除了空间段。它在现实操作约束下估计终端数量、受信任的中继节点需求和跳距分布。奥地利案例随后被用作基准,以基于人口和地理范围推导其他欧盟成员国的扩展规则。结果提供了欧洲国家QKD骨干网规模的一阶规划估计。这些估计不是旨在部署设计,而是作为规划级别的参考,支持早期阶段的成本评估和基础设施尺寸确定,以在EuroQCI框架下进行。
英文摘要:
The European Union is developing the European Quantum Communication Infrastructure (EuroQCI) as a pan-European network to provide secure communication capabilities across Member States, including governmental and critical-infrastructure domains. While the strategic objective is defined at EU level, the required scale and structure of national quantum key distribution (QKD) networks remain largely unspecified. This work addresses the question of how to plan and size national terrestrial QKD networks to support critical infrastructure and public authorities. We propose a reproducible planning methodology that estimates network size, total fiber length, and the number of required QKD components based on a small set of explicit assumptions. The approach is demonstrated for Austria, where a synthetic but structured network model is constructed and evaluated using Monte Carlo simulation. The model focuses on terrestrial QKD infrastructure and explicitly excludes space-based segments. It estimates endpoint counts, trusted repeater node requirements, and hop-length distributions under realistic operational constraints. The Austrian case is then used as a baseline to derive scaling rules for other EU Member States based on population and geographic extent. The results provide first-order planning estimates for national QKD backbone sizes across Europe. These estimates are not intended as deployment designs but as planning-level references that support early-stage cost assessment and infrastructure dimensioning under the EuroQCI framework.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。