arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2603.06376quant-ph
收藏

主动体积架构的调度器

A Scalable, Optimized Scheduler for the Active Volume Architecture

PsiQuantum

Sam Heavey, Athena Caesura

AI总结:

该研究提出了一种主动体积架构的调度器,通过优化量子比特角色分配和开销计算,提高了资源估计的准确性,并在测试电路中实现了显著的运行时加速。

摘要:

我们通过明确调度主动体积块的执行时间来提高主动体积资源估计的准确性。我们提出了软件,采用贪心策略为每个逻辑量子比特在每个逻辑周期中分配角色(例如,工作区、过期状态存储和桥接量子比特)。我们通过实证推导出一个新的公式,用于桥接和过期状态量子比特的开销,并提高了运行时估计的准确性,揭示出比以前由分析模型预测的更大电路可以在给定计算机上运行。对于一个4×4的费米- Hubbard模拟测试电路,这会产生1.76倍的运行时加速,并与arXiv:2501.06165中使用的模型相比,桥接和过期状态量子比特的开销减少了1.44倍。此外,我们还表明,对于这个测试电路,在逻辑量子比特少于600个的计算机中,反应时间在运行时估计中可以忽略不计,并且每个逻辑周期的反应层数仍保持为1。我们的结果为主动体积架构的完整编译流水线铺平了道路,并改进了分析资源估计。

英文摘要:

We improve the accuracy of Active Volume (AV) resource estimates by explicitly scheduling when AV blocks execute and when their reactions complete. We present a cycle-accurate scheduler that assigns each logical qubit a role in every logical cycle. The approach allows us to capture execution effects such as gate packing inefficiencies, parallelization overhead, and memory requirements. In addition, the scheduler explicitly tracks reaction latency and stale state lifetimes, rather than assuming that stale states can be absorbed into a fixed overhead. For a $4\times4$ Fermi--Hubbard test circuit, we find a transition to reaction-dominant regime at approximately $10^3$ logical qubits. Beyond $10^3$ logical qubits, stale state accumulation restricts the effective workspace and the benefit of adding more qubits is substantially decreased. Below this regime the scheduler predicts a $1.64\times$ runtime speedup relative to the previous Analytic Resource Estimators (ARE), primarily due to a $1.80\times$ reduction in average memory occupancy. We also show that parallelization and reaction latency overhead grows with available workspace, inverting the trend of the ARE model used in \cite{Caesura25}. These results provide a path toward reaction-aware analytic resource estimates and a full compilation pipeline for AV architectures. We also develop novel techniques for estimating Y state and routing demand and apply them to our test circuit. The Y state estimates result in small efficiency boost and the routing demand estimates show that routing should not bottleneck early fault-tolerant AV devices.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑