具有超大规模计算中心和模块化数据中心的电力市场模型

Carbon-Aware Data Center Workload Allocation: Emission Disclosure, Capacity Leasing, and Contract Reshuffling

University of California, Santa Cruz(加州大学圣克鲁兹分校);Purdue University(普渡大学)

Yihsu Chen, Abel Souza, Fargol Nematkhah, Andrew L. Liu

AI总结:

本文提出了一种电力市场模型,允许超大规模计算中心将LLM推理任务迁移到地理分布的模块化数据中心,以优化能源利用和减少排放。

摘要:

人工智能的快速普及导致了计算需求的增长,大型语言模型(LLMs)自2022年ChatGPT问世以来便处于领先地位。同时,大量可再生能源已被部署,但由于传输拥堵和需求不足,最终仍被弃用。本文开发了一个电力市场模型,允许超大规模计算中心将LLM推理工作负载在空间上迁移至地理分布的模块化数据中心(MDCs),这些MDCs与网络边缘的接近可再生能源源共存。我们介绍了超大规模计算中心和MDCs在额外消费者、生产者和电力电网运营商面临的问题,其中超大规模计算中心进入协议租赁MDCs,同时确保所需的服务水平目标(SLOs)得到满足。整体市场模型被表述为互补性问题,其中证明了解的存在性和唯一性。当将该模型应用于IEEE RTS-24 bus案例研究时,我们显示,即使有规定要求MDCs披露其能源供应来源的CO₂排放量,由于所谓的合同重新安排,租用更少污染的MDCs不太可能产生有意义的排放减少。当传统负载通过电力购买协议通过远期合同供应时,这种情况可以得到缓解。这也会导致当超大规模计算中心越来越具有成本意识时,系统拥堵下降。

英文摘要:

The rapid adoption of AI has driven rapid growth in computational demand, with large language models (LLMs) at the forefront since ChatGPT's debut in 2022. Meanwhile, large amounts of renewable energy are ultimately curtailed due to transmission congestion and inadequate demand. This work develops a power market model that allows hyperscalers to spatially migrate LLM inference workloads to geo-distributed modular datacenters (MDCs) co-located with renewable generation at the edge of the network. We introduce the optimization problems faced by the hyperscaler and MDCs in addition to consumers, producers, and the electric grid operator, where the hyperscaler leases MDC capacity while ensuring that required service level objectives (SLOs) are met. The overall market model is formulated as a complementarity problem, for which we establish equilibrium existence and uniqueness of certain aggregate market quantities. We further show that bilateral contract allocations can vary while preserving the same physical market outcome, so cleaner contract-attributed procurement need not imply additional clean generation. Applying the model to the IEEE RTS-24 bus system, we find that even when MDCs disclose the CO$_2$ emissions associated with their energy supply, renting less polluting MDCs yields limited system emission reductions because of \textit{contract reshuffling}. This effect can be mitigated when conventional loads are supplied through forward contracts such as power purchase agreements. Interestingly, this also reduces system congestion as the hyperscaler becomes increasingly cost-aware.