This paper investigates a novel problem, namely the Uncertain Agile Earth Observation Satellite Scheduling Problem (UAEOSSP). Unlike the static AEOSSP, it takes into account a range of uncertain factors (e.g., task profit, resource consumption, and task visibility) in order to reflect the reality that the actual information is inherently unknown beforehand. An effective Genetic Programming Hyper-Heuristic (GPHH) is designed to automate the generation of scheduling policies. The evolved scheduling policies can be utilized to adjust plans in real time and perform exceptionally well. Experimental results demonstrate that evolved scheduling policies significantly outperform both well-designed Look-Ahead Heuristics (LAHs) and Manually Designed Heuristics (MDHs). Specifically, the policies generated by GPHH achieve an average improvement of 5.03% compared to LAHs and 8.14% compared to MDHs.
A Linear Programming Enhanced Genetic Algorithm for Hyperparameter Tuning in Machine Learning
Brij Disa Centre for Data Science and Artificial Intelligence(布里吉·迪萨数据科学与人工智能中心);Indian Institute of Management Ahmedabad(印度管理学院艾哈迈达巴德分校);Department of Statistics and Data Science(统计与数据科学系);Indian Institute of Technology Kanpur(印度理工学院坎普尔分校)
Genetic Algorithm based hyper-parameters optimization for transfer Convolutional Neural Network
State Key Laboratory of High-end Server & Storage Technology(高端服务器与存储技术国家重点实验室);Inspur Group Co., Ltd(浪潮集团有限公司);Shandong Hailiang Information Technology Institutes(山东海量信息技术研究院);Inspur Electronic Information Industry Co., Ltd(浪潮电子信息产业股份有限公司);Guangdong Inspur Intelligent Computing Technology Co., Ltd(广东浪潮智慧计算技术有限公司)
Accelerated Genetic Programming Hyper-Heuristics for Simulation-Based Scheduling via Agentic AI
Research Engineering Team REANNZ New Zealand;Centre for Data Science;Artificial Intelligence \& School of Engineering;Computer Science Victoria University of Wellington New Zealand
Guiding Large Language Models with Genetic Programming-Evolved Heuristic Knowledge for Dynamic Multi-Mode Project Scheduling
Centre for Data Science and Artificial Intelligence(数据科学与人工智能中心);School of Engineering and Computer Science(工程与计算机科学学院);Victoria University of Wellington(惠灵顿维多利亚大学)
MAP-Elites based Hyper-Heuristic for the Resource Constrained Project Scheduling Problem
Commonwealth Scientific and Industrial Research Organisation(联邦科学与工业研究组织);Indian Institute of Technology(印度理工学院);University of New South Wales(新南威尔士大学)
A Reinforcement Learning-assisted Genetic Programming Algorithm for Team Formation Problem Considering Person-Job Matching
National University of Defense Technology(国防科技大学);Dalian Maritime University(大连海事大学);University of Alberta(阿尔伯塔大学);Qatar University(卡塔尔大学);Nanyang Technological University(南洋理工大学)