arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2601.19147cs.CG
收藏

矩形环境中文机器人最优运动规划

Optimal Motion Planning for Two Square Robots in a Rectilinear Environment

Duke University(杜克大学);TU Eindhoven(埃因霍温理工大学)

Pankaj K. Agarwal, Mark de Berg, Benjamin Holmgren, Alex Steiger, Martijn Struijs

AI总结:

研究了矩形环境中两个机器人最优运动规划问题,提出了最小总和和最小化完成时间两种变种,其中前者获得多项式时间算法,后者被证明为NP难问题。

摘要:

设$\mathcal{W} \subset \mathbb{R}^2$为一个矩形多边形环境(即可能有孔的矩形多边形),总共有$n$个顶点,$A,B$为两个机器人,每个都建模为一个轴对齐的单位正方形,可以在$\mathcal{W}$内矩形移动。目标是计算一个无碰撞的运动计划$\boldsymbolπ$,即一个连续移动$A$从$s_A$到$t_A$和$B$从$s_B$到$t_B$的运动计划,使得$A$和$B$始终在$\mathcal{W}$内且在运动过程中不相互碰撞。我们研究了这个问题的两个变种,重点关注$\boldsymbolπ$的最优性,并获得了以下结果。\n1. 最小总和:这里的目标是计算一个最小化机器人路径长度总和的运动计划。我们提出了一个$O(n^4\log{n})$时间的算法,用于计算最小总和问题的最优解。这是第一个多项式时间算法,用于在平面多边形环境中计算两个机器人在障碍物中的无碰撞运动。\n2. 最小化完成时间:这里机器人最大移动速度为单位速度,目标是计算一个最小化机器人到达目标位置所需最大时间的运动计划。我们证明了最小化完成时间变种是NP难的。

英文摘要:

Let $\mathcal{W} \subset \mathbb{R}^2$ be a rectilinear polygonal environment (that is, a rectilinear polygon potentially with holes) with a total of $n$ vertices, and let $A,B$ be two robots, each modeled as an axis-aligned unit square, that can move rectilinearly inside $\mathcal{W}$. The goal is to compute a collision-free motion plan $\boldsymbolπ$, that is, a motion plan that continuously moves $A$ from $s_A$ to $t_A$ and $B$ from $s_B$ to $t_B$ so that $A$ and $B$ remain inside $\mathcal{W}$ and do not collide with each other during the motion. We study two variants of this problem which are focused additionally on the optimality of $\boldsymbolπ$, and obtain the following results. 1. Min-Sum: Here the goal is to compute a motion plan that minimizes the sum of the lengths of the paths of the robots. We present an $O(n^4\log{n})$-time algorithm for computing an optimal solution to the min-sum problem. This is the first polynomial-time algorithm to compute an optimal, collision-free motion of two robots amid obstacles in a planar polygonal environment. 2. Min-Makespan: Here the robots can move with at most unit speed, and the goal is to compute a motion plan that minimizes the maximum time taken by a robot to reach its target location. We prove that the min-makespan variant is NP-hard.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑