Fraunhofer Institute for Algorithms and Scientific Computing SCAI(弗劳恩霍夫算法与科学计算研究所 SCAI);Fraunhofer Institute for Systems- & Innovation Research ISI(弗劳恩霍夫系统与技术创新研究所 ISI);Technical University of Berlin(柏林工业大学);Kassel University(卡塞尔大学);Fraunhofer Research Institution for Energy Infrastructure and Geotechn. IEG(弗劳恩霍夫能源基础设施与岩土研究学院 IEG)

Mehrnaz Anvari, Marius Neuwirth, Okan Akca, Luna Lütz, Simon Lukas Bussmann, Tobias Fleiter, Bernhard Klaassen

AI总结:

本文通过结合能源系统情景与物理网络模拟,提出设计CO2管道网络的方法,以德国2045年预测为案例,研究CO2平衡与管道拓扑结构,评估技术可行性,提出约7000公里管道的可行方案及170亿欧元的投资成本。

摘要:

碳捕集与封存或利用(CCUS)将在许多经济体实现气候中性中发挥重要作用。管道被广泛认为是CO2运输最有效的方式;然而,目前尚不存在。政策制定者和企业需要在高度不确定性下开发大规模基础设施。本文提出一种综合方法,通过结合能源系统情景与物理网络模拟来设计CO2管道网络。以德国2045年预测为案例,我们推导出空间上高分辨率的CO2平衡,以开发一个遵循现有天然气管道走廊的密集相CO2管道拓扑结构。分析的系统包括现有水泥和石灰生产、垃圾焚烧、碳用户、四个沿海CO2枢纽和边境交叉点。然后,我们应用多物理网络模拟器MYNTS来评估该网络的技术可行性。我们确定了管道直径、泵站位置和运行条件,以确保稳定的密集相运输。该方法明确考虑了海拔和可能的杂质。结果表明,约7000公里管道长度、主走廊上混合规范直径为DN700、分支上为DN500/DN400的系统,能够连接大多数站点。优化管道系统的投资成本计算为约170亿欧元。该方法提供了一个可重复使用的框架,并可转移到其他国家和欧洲范围。

英文摘要:

Carbon capture and storage or utilization (CCUS) will play an important role to achieve climate neutrality in many economies. Pipelines are widely regarded as the most efficient means of CO2 transport; however, they are currently non-existent. Policy-makers and companies need to develop large-scale infrastructure under substantial uncertainty. Methods and analyses are needed to support pipeline planning and strategy development. This paper presents an integrated method for designing CO2 pipeline networks by combining energy system scenarios with physical network simulation. Using Germany as a case study in a projection to the year 2045, we derive spatially highly resolved CO2 balances to develop a dense-phase CO2 pipeline topology that follows existing gas pipeline corridors. The analyzed system includes existing sites for cement and lime production, waste incineration, carbon users, four coastal CO2 hubs, and border crossing points. We then apply the multiphysical network simulator MYNTS to assess the technical feasibility of this network. We determine pipeline diameters, pump locations, and operating conditions that ensure stable dense-phase transport. The method explicitly accounts for elevation and possible impurities.The results indicate that a system of about 7000 km pipeline length and a mixed normed diameter of DN700 on main corridors and of DN500/DN400 on branches presents a feasible solution to connect most sites. Investment costs for the optimized pipeline system are calculated to be about 17 billion Euros. The method provides a reproducible framework and is transferable to other countries and to European scope.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑