利用双层规划和贪心种子模拟退火优化交通缓解道路设计:刚果金基桑萨案例研究
Optimal Traffic Relief Road Design using Bilevel Programming and Greedy Seeded Simulated Annealing: A Case Study of Kinshasa
AI总结:
本研究通过双层规划与贪心种子模拟退火算法,优化基桑萨市交通缓解道路设计,提升道路优先级并改善交通流量。
摘要:
背景:刚果金基桑萨市面临严重的交通拥堵,需要战略性的基础设施容量提升。尽管已提出全面的总体规划,但其实施需要大量资金投入,而刚果民主共和国(DRC)作为新兴经济体,资金仍然受限。本研究提出了一种基于交通流量的算法,以支持优先道路段的发展。目标是使道路建设项目的优先级划分更加有效,并促进有限基础设施预算的最优分配。\n方法:通过制定一个标准的交通网络设计问题(TNDP),该问题包括针对基桑萨市的估计起源需求数据。鉴于30节点网络设计的高计算需求,TNDP相关的元启发式算法(GA、ACO、PSO、SA、TS、贪心)被选择性地使用并进行混合,以获得高质量、稳定的解决方案。设计了贪心搜索种子模拟退火和禁忌搜索以实现设计目标。\n结果:贪心模拟退火和贪心禁忌搜索在旅行时间减少和解决方案稳定性方面优于其他求解器,同时将网络边介数中心性提高了近两倍半。\n结论:提出了道路优先级,包括连接Bandundu和Kongo Central入口点到主要吸引中心(Limete Poids Lourd、Gombe、机场)以及额外的内城区域(Ngaliema、Selembao、Lemba、Masina、Kimwenza)。
英文摘要:
Context: The city of Kinshasa faces severe traffic congestion, requiring strategic infrastructure capacity enhancements. Although a comprehensive master plan has been proposed, its implementation requires substantial financial investment, which remains constrained in the Democratic Republic of the Congo (DRC), an emerging economy. This research proposes a traffic flow based algorithm to support the development of priority road segments. The objective is to enable more effective prioritisation of road construction projects and facilitate the optimal allocation of limited infrastructure budgets. Methods: The study was conducted by formulating a standard transport network design problem (TNDP) that included estimated origin demand data specific to the city of Kinshasa. Given the high computational nature of the 30 node network design, TNDP relevant metaheuristics (GA, ACO, PSO, SA, TS, Greedy) were used selectively and hybridised to achieve high quality, stable solutions. A greedy search seeded simulated annealing and Tabu search were devised to achieve the design goals. Results: Greedy Simulated Annealing and Greedy Tabu search yielded the best travel time reduction and the most stable solutions compared to other solvers, also improving network edge betweenness centrality by nearly a scale of two and a half. Conclusions: Road priorities were proposed, including junctions connecting the Bandundu and Kongo Central entry point to main attraction centres (Limete Poids Lourd, Gombe, Airport) and additional inner city areas (Ngaliema, Selembao, Lemba, Masina, Kimwenza).
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。