面向电网的多周期灵活性聚合——一种受限的zonotope方法
Towards grid-aware multi-period flexibility aggregation - A constrained zonotope approach
AI总结:
本文提出一种基于受限zonotope的多周期灵活性聚合方法,通过结构利用提升计算效率,在15节点配电电网中验证了其在减少计算时间方面的优势。
摘要:
聚合方案通过减少需要单独考虑的设备数量来降低电力系统运行的计算复杂性。这可以通过计算几何工具实现,将可行集投影到连接点的决策变量上。集合投影在多周期电力系统运行中计算成本很高,因此需要通过集合表示的结构利用来提高效率。本文提出了一种基于受限zonotope的高效灵活性聚合方法,并在具有时间依赖性的15节点配电电网中对所提方法进行了评估,结果表明该方法在计算时间上显著优于经典多面体投影方法。
英文摘要:
Aggregation schemes provide a means to reduce the computational complexity of power system operation by reducing the number of devices that are considered individually. This can be achieved with tools of computational geometry, where the feasible set is projected onto the decision variables of the point of interconnection. Set projection is computationally expensive, especially in the context of multi-period power system operation. This calls for efficiency improvements via structure exploitation of set representations. This paper proposes efficient flexibility aggregation via constrained zonotopes. We evaluate the performance of the proposed method on a 15-bus distribution grid with time-dependent elements for up to 96 timesteps. The results suggest that the presented method significantly improves computation times compared to classic polytope projection approaches.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。