arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2510.09727physics.acc-phnucl-ex
收藏

基于SATELIT(一个CEA-Saclay液态锂靶)的10 kW HiCANS的中子产生

Neutron production with a 10 kW HiCANS based on SATELIT, a CEA-Saclay target with liquid lithium

CEA-Saclay(法国原子能和替代能源委员会萨克雷中心)
L. Thulliez, N. Berton, R. Boudouin, N. Cavalière, S. Cazaux, T. Chaminade, N. Chauvin, D. Chirpaz, J. -L. Courouau, Q. Cridling, P. Daniel-Thomas, J. Darpentig… 展开作者

L. Thulliez, N. Berton, R. Boudouin, N. Cavalière, S. Cazaux, T. Chaminade, N. Chauvin, D. Chirpaz, J. -L. Courouau, Q. Cridling, P. Daniel-Thomas, J. Darpentigny, G. Debras, G. Disset, A. Drouart, E. Dumonteil, R. Duperrier, R. Ferdinand, E. Giner Demange, J. -C. Guillard, N. Jonqueres, T. Lebrun, D. Loiseau, J. Mendes, B. Mom, F. Ott, C. Péron, J. Phocas, Y. Reinert, A. Roger, Y. Sauce, F. Senée, M. Trocmé, C. Veyssière, D. Vurpillot, X. Wohleber

AI总结:

本研究基于CEA-Saclay的IPHI加速器与液态锂靶SATELIT开发HiCANS系统,通过10 kW质子束辐照成功产生中子,验证了该设施作为中型中子源的潜力。

摘要:

高流强加速器驱动中子源(HiCANS)目前正在欧洲各地开发,以应对中型中子源的短缺问题,因为过去几年中许多研究用核反应堆已被退役。在CEA-Saclay,利用IPHI加速器(提供3 MeV、流强高达100 mA的质子束)和名为SATELIT的CEA-Saclay液态锂靶,开发了一套HiCANS系统。在2024至2025年间,开展了一次成功的实验活动,在此期间,将近100小时将10 kW的质子束导向液态锂靶,通过7Li(p,n)7Be核反应产生中子。在整个实验活动期间,累计沉积束流功率达840 kW·h,其中包括两次连续运行超过11小时的记录。与SATELIT耦合的聚乙烯慢化剂实现了热中子束的引出,在距引出点1.4米处测得的通量超过10^6 n·cm^-2·s^-1,足以满足众多中子应用需求。该设施长期运行的下一步是制定策略,以缓解与系统内7Be积累相关的放射学问题。总体而言,这项工作表明此类设施能够在欧洲未来中型中子源中发挥重要作用。

英文摘要:

High-Current Accelerator-driven Neutron Sources (HiCANS) are currently under development across Europe to address the shortage of medium-scale neutron sources, as many research nuclear reactors have been decommissioned over the past several years. At CEA-Saclay, a HiCANS has been developed utilizing the IPHI accelerator, which delivers a 3 MeV proton beam with a current of up to 100 mA, and the CEA-Saclay liquid lithium target named SATELIT. In 2024-2025, a successful experimental campaign was conducted, during which a 10 kW proton beam was directed at the liquid lithium target for nearly 100 h to generate neutrons via the 7Li(p,n)7Be nuclear reaction. Throughout the experimental campaign, a total deposited beam power of 840~kW.h was accumulated, including two continuous operational days exceeding 11 h each. A polyethylene moderator coupled with SATELIT enabled the extraction of a thermal neutron beam, with a flux measured at 1.4 m from the extraction point exceeding $10^6$ n.cm$^{-2}$.s$^{-1}$, which is sufficient for numerous neutron applications. The next step for the long-term operation of this facility involves developing strategies to mitigate the radiological concerns associated with the accumulation of 7Be within the system. Overall, this work demonstrates that such facilities can play a significant role in the future of medium-scale neutron sources in Europe.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑