一种用于多目标节能流水车间调度问题的带有局部搜索的改进NSGA-II
An Improved NSGA-II with local search for multi-objective energy-efficient flowshop scheduling problem
AI总结:
本文提出一种结合田口方法和局部搜索的改进NSGA-II算法(NSGA-II_LS),用于解决考虑机器能耗的多目标置换流水车间调度问题(PFLSP),在最小化流经时间和能耗上均取得显著改进。
摘要:
降低制造业及其他工业的能耗日益受到关注。制造业的能耗与高效的调度直接相关。本文的贡献包括:i) 考虑系统中每台机器能耗的置换流水车间调度问题(PFLSP)数学模型。ii) 针对多目标PFLSP模型,提出了一种结合田口方法并进一步融入局部搜索的改进非支配排序遗传算法(NSGA-II_LS)。iii) 求解了Taillard(1993)的90个基准问题,以最小化流经时间(FT)和能耗(EC)。所提出的NSGA_LS算法在选自已发表文献Li等(2018)的基准问题上进行了性能评估。从这些结果可以看出,所提出的算法在9个案例中的5个案例里,在FT和EC最小化这两个目标上均表现更好。在FT目标上,算法在9个案例中的8个表现更好;在EC目标上,9个案例中的5个表现更好。总体而言,在基准问题上,所提出的算法在FT和EC最小化方面分别实现了47%和15.44%的平均改进。从90个基准问题的结果来看,随着问题规模从5台机器增加到10台机器,两个解之间FT和EC的平均差异在减小(仅一例除外)。此外,随着作业和机器问题规模的增加,所提出算法的性能更佳。这些结果可作为进一步研究的标准解。
英文摘要:
There has been an increasing concern to reduce the energy consumption in manufacturing and other industries. Energy consumption in manufacturing industries is directly related to efficient schedules. The contribution of this paper includes: i) a permutation flowshop scheduling problem (PFLSP) mathematical model by considering energy consumed by each machine in the system. ii) an improved non-dominated sorted genetic algorithm with Taguchi method with further incorporating local search (NSGA-II_LS) is proposed for the multi-objective PFLSP model. iii) solved 90 benchmarks problems of Taillard (1993) for the minimisation of flowtime (FT) and energy consumption (EC). The performance of the proposed NSGA_LS algorithm is evaluated on the benchmark problems selected from the published literature Li et. al, (2018). From these results, it is noted that the proposed algorithm performed better on both the objectives i.e., FT and EC minimization in 5 out of 9 cases. On FT objective our algorithm performed better in 8 out of 9 cases and on EC objective 5 out of 9 cases. Overall, the proposed algorithm achieved 47% and 15.44% average improvement in FT and EC minimization respectively on the benchmark problems. From the results of 90 benchmark problems, it is observed that average difference in FT and EC between two solutions is decreasing as the problem size increases from 5 machines to 10 machines with an exception in one case. Further, it is observed that the performance of the proposed algorithm is better as the problem size increases in both jobs and machines. These results can act as standard solutions for further research.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。