arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2412.15713stat.AP
收藏

混凝土箱梁桥的荷载试验及结构健康监测数据集

Data Set of Load Tests and Structural Health Monitoring of a concrete Box Girder bridge

Helmut Schmidt University(赫尔穆特·施密特大学);Technical University of Munich(慕尼黑工业大学)

Martin Koehncke, Yogi Jaelani, Alexander Mendler, Lizzie Neumann, Philipp Wittenberg, Alina Rode-Klemm, Sylvia Kessler

AI总结:

本文提供了一座混凝土箱梁桥的静动态荷载试验数据集,用于评估桥梁实际承载能力及结构健康监测系统性能,数据包含车辆通行时的加速度时序和静态载荷下的应变测量。

摘要:

荷载试验是验证桥梁是否符合设计规范和评估其实际承载能力的重要工具。本文记录了对一座混凝土箱梁桥进行的一系列静动态荷载试验。该桥梁配备了长期结构健康监测(SHM)系统,可提供整个季节周期的数据以供学术研究使用。由于数据量庞大,完整SHM数据无法提供,荷载试验数据可在Zenodo上获取。静动态试验的目标是(i)在不同加载场景下捕捉桥梁的当前状态并识别潜在结构弱点,(ii)评估系统对小质量变化的敏感性,(iii)通过模拟设计载荷案例生成用于模型校准和验证异常检测算法的数据。本文呈现了一个从仪器化混凝土箱梁桥获得的实验数据集。提供的测量数据有助于减少全规模结构荷载试验数据集有限可用性的差距。数据集包括车辆通行时的加速度时序和静态载荷下的应变测量。桥梁的建设及结构健康监测系统均详细描述并附有图纸。测量数据在开放获取数据文件中的结构也简要解释。后续研究将与多个研究小组合作分析SHM数据。

英文摘要:

Static and dynamic load tests were conducted on an anonymized in-service prestressed concrete box girder bridge constructed in 1972 and designed for Bridge Class~30 according to DIN~1072. The bridge is instrumented as part of the DTEC-SHM research initiative with a permanent structural health monitoring system comprising 128 sensors, including accelerometers, strain sensors, inclinometers, displacement transducers, embedded temperature sensors, and weather stations. The test program includes long-term static loading with stepwise added masses of 680 kg, 1420 kg, and 2160 kg, short-term static truck parking positions, and repeated dynamic truck crossings under loaded and unloaded vehicle configurations. The short-term static tests used a loaded truck of 21250 kg parked at three bridge positions, while the dynamic tests used loaded and unloaded truck configurations of 21250 kg and 12340 kg at speeds up to 13.9 m/s. The published load-test data are available on Zenodo in HDF5 format and include synchronized measurements from the monitoring system, temporary laser sensors used for vehicle-position and passage-time validation, and derived tracked eigenfrequency time series from the reference and long-term static-load-test period. The bridge geometry, sensor layout, acquisition system, load cases, truck geometry, and data hierarchy are documented to support reuse of the data. Plausibility checks are presented for the main response quantities, including laser-based validation of parking positions and passage windows, vibration spectra and tracked modal parameters, and repeatable strain and displacement response profiles under crawl-speed truck passages. The data set addresses the scarcity of publicly available full-scale bridge load-test data and supports applications such as finite element model calibration, neutral-axis tracking, influence-line extraction, and data-driven anomaly detection.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑