arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2412.10083cs.MAcs.RO
收藏

异构多机器人图覆盖问题中的邻近与运动约束

Heterogeneous Multi-Robot Graph Coverage with Proximity and Movement Constraints

Bar Ilan University(巴伊兰大学)

Dolev Mutzari, Yonatan Aumann, Sarit Kraus

AI总结:

针对带邻近与运动约束的多机器人图覆盖问题,提出形式化模型、FPT精确算法及两种树图上的PTAS近似方案,实现最少步数覆盖。

摘要:

多机器人覆盖问题已在机器人学、规划与多智能体系统中得到广泛研究。本文考虑当机器人存在邻近约束(如智能体间最大距离,或蓝色智能体必须与红色智能体相邻)和运动约束(如地形可通行性和材料承载能力)时的覆盖问题。此类约束在现实应用中自然产生,例如搜索救援和维护操作。在此设定下,目标是计算图上的覆盖游程,使其步数最少,并满足邻近与运动约束。针对该问题,我们做出四项贡献:(i)问题的形式化表述;(ii)一个精确算法,其参数化复杂度关于F、d和tw分别为FPT,其中F为编码邻近约束的机器人队形集合,d为图的最大节点度,tw为图的树宽;(iii)对于图为树的情形:一个PTAS近似方案,给定近似参数ε,可产生一个在ε乘以误差(||F||, d)范围内的最优游程,且计算时间在poly(n)乘以h(1/ε,||F||)内;(iv)对于图为树且k=3个机器人、所有智能体需连通的情形:一个PTAS方案,其乘法近似误差为1+O(ε),与最大度d无关。

英文摘要:

Multi-Robot Coverage problems have been extensively studied in robotics, planning and multi-agent systems. In this work, we consider the coverage problem when there are constraints on the proximity (e.g., maximum distance between the agents, or a blue agent must be adjacent to a red agent) and the movement (e.g., terrain traversability and material load capacity) of the robots. Such constraints naturally arise in many real-world applications, e.g. in search-and-rescue and maintenance operations. Given such a setting, the goal is to compute a covering tour of the graph with a minimum number of steps, and that adheres to the proximity and movement constraints. For this problem, our contributions are four: (i) a formal formulation of the problem, (ii) an exact algorithm that is FPT in F, d and tw, the set of robot formations that encode the proximity constraints, the maximum nodes degree, and the tree-width of the graph, respectively, (iii) for the case that the graph is a tree: a PTAS approximation scheme, that given an approximation parameter epsilon, produces a tour that is within a epsilon times error(||F||, d) of the optimal one, and the computation runs in time poly(n) times h(1/epsilon,||F||). (iv) for the case that the graph is a tree, with $k=3$ robots, and the constraint is that all agents are connected: a PTAS scheme with multiplicative approximation error of 1+O(epsilon), independent of the maximal degree d.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑