随机充电需求下纯电动公交车充电设备定位与分配问题

Problem of Locating and Allocating Charging Equipment for Battery Electric Buses under Stochastic Charging Demand

Sadjad Bazarnovi, Taner Cokyasar, Omer Verbas, Abolfazl Kouros Mohammadian

AI总结:

针对随机充电需求下纯电动公交车充电设备定位与分配问题,提出MINLP优化框架结合精确求解与启发式算法,发现遗传算法更适用于大规模实例,并验证了协作部署策略的成本效益。

摘要:

公交车电动化在推进城市交通可持续性方面发挥着至关重要的作用。然而,纯电动公交车(BEB)通常需要充电,这使得纯电动公交车充电设备定位与分配问题(PLACE-BEB)对高效运营至关重要。本研究提出了一个优化框架来解决PLACE-BEB问题,即在随机充电需求下确定充电桩类型在潜在位置的最优布局。利用现有的随机选址文献,我们开发了一个混合整数非线性规划(MINLP)来对该问题进行建模。为了求解该问题,我们开发了一种精确求解方法,旨在最小化与建设充电站、充电桩分配、前往站点以及在平均排队和充电时间相关的成本。排队动态使用M/M/s队列进行建模,其中每个位置的服务台数量被视为决策变量。为了提高可扩展性,我们实现了模拟退火(SA)和遗传算法(GA),从而能够高效求解大规模问题。对这些方法的计算性能进行了全面评估,结果显示SA对小规模问题有效,而GA在大规模实例上优于其他方法。通过比较仅车库、仅其他和混合场景以及联合部署的案例研究,突显了协作与综合方法的成本效益。敏感性分析表明,等待时间是决策中需要考虑的关键因素。

英文摘要:

Bus electrification plays a crucial role in advancing urban transportation sustainability. Battery Electric Buses (BEBs), however, often need recharging, making the Problem of Locating and Allocating Charging Equipment for BEBs (PLACE-BEB) essential for efficient operations. This study proposes an optimization framework to solve the PLACE-BEB by determining the optimal placement of charger types at potential locations under the stochastic charging demand. Leveraging the existing stochastic location literature, we develop a Mixed-Integer Non-Linear Program (MINLP) to model the problem. To solve this problem, we develop an exact solution method that minimizes the costs related to building charging stations, charger allocation, travel to stations, and average queueing and charging times. Queueing dynamics are modeled using an M/M/s queue, with the number of servers at each location treated as a decision variable. To improve scalability, we implement a Simulated Annealing (SA) and a Genetic Algorithm (GA) allowing for efficient solutions to large-scale problems. The computational performance of the methods was thoroughly evaluated, revealing that SA was effective for small-scale problems, while GA outperformed others for large-scale instances. A case study comparing garage-only, other-only, and mixed scenarios, along with joint deployment, highlighted the cost benefits of a collaborative and a comprehensive approach. Sensitivity analyses showed that the waiting time is a key factor to consider in the decision-making.