对冲氢气:绿色氢气生产商在不确定性下的规划与签约

Hedging Hydrogen: Planning and Contracting Under Uncertainty for a Green Hydrogen Producer

Mines Paris - Centre PERSEE(巴黎矿业学院 PERSEE 中心);Technical University of Denmark (DTU)(丹麦技术大学)

Owen Palmer, Hugo Radet, Simon Camal, Jalal Kazempour, Robin Girard

AI总结:

本研究针对绿色氢气项目的财务风险问题,提出两阶段随机规划模型,比较不同建模方法有效性,发现不使用随机建模会使部分HPA合同类型项目生产成本增加30%,强调HPA合同义务对限制需求不确定性的重要性。

摘要:

利用可再生电力通过水电解生产绿色氢气被认为对全球经济特定部门的脱碳至关重要,但由于单个项目面临的财务风险被感知,该行业的发展滞后于预期。这种风险源于多种不确定性,包括未来氢气需求、可变可再生能源以及波动的能源市场价格。这些不确定性的相互作用复杂,但氢气项目的分析通常使用简化模型,往往忽略不确定性和/或能源密集型消费者典型的能源对冲实践。本研究定义了一套规划方法(规划策略),以比较不同建模方法的有效性。我们提出一个两阶段以市场为中心的随机规划,代表氢气生产商通过氢气承购合同(氢气采购协议,HPA)向工业客户供应氢气。该模型可用于获取设备规模决策,以及使用电力采购协议(PPA)和电力期货的能源对冲决策。我们发现,对于某些HPA合同类型,在相同项目的情景压力测试中,不使用随机建模可能导致规划决策使生产成本增加30%。这可能导致一些项目被开发商放弃,因成本预测过高而被错误地认为不可行。结果还表明,HPA合同的 volumetric 义务在限制需求不确定性方面的重要性。

英文摘要:

Green hydrogen production by water electrolysis using renewable electricity is considered essential for decarbonisation of certain sectors of the global economy, however development of the industry is lagging behind expectations due to the perceived financial risk for individual projects. This risk stems from a number of uncertainties, including future hydrogen demand, variable renewable energy sources, and volatile energy market prices. The interaction of these uncertainties is complex, yet the analysis of hydrogen projects is often carried out using simplified modelling that often omits uncertainty and/or energy hedging practices which are typical for intensive power consumers. In this study, we define a set of planning methods (planning policies) in order to compare the effectiveness of different modelling approaches. We propose a 2-stage market-focused stochastic program to represent a hydrogen producer supplying an industrial customer through a hydrogen offtake contract (a Hydrogen Purchase Agreement, or HPA). The model can be used to obtain equipment sizing decisions, as well as energy hedging decisions using Power Purchase Agreements (PPA's) and power futures. We find that for some HPA contract types, failure to use stochastic modelling can lead to planning decisions that result in 30% higher production costs during scenario stress-testing for the same project. This could lead to some projects being discarded by developers, incorrectly deemed to be unviable due to cost projections being too high. The results also show the importance of HPA contract volumetric obligations in limiting demand uncertainty.