超互联包裹物流枢纽中的动态劳动力调度与调配
Dynamic Workforce Scheduling and Relocation in Hyperconnected Parcel Logistic Hubs
AI总结:
针对包裹到达与人力供应的不确定性,本文提出结合传感器数据和需求预测的动态劳动力调度与跨枢纽调配启发式方法,并通过中国真实物流网络验证其显著优于传统策略。
摘要:
随着新冠疫情期间电子商务的发展,许多包裹物流公司面临的主要挑战之一是设计可靠且灵活的调度算法,以应对物流枢纽中包裹到达和人力供应的不确定性,尤其是那些高度依赖劳动力的枢纽。当前,大多数劳动力调度是周期性的,并且局限于单一设施,因此每个枢纽所需工人的数量被迫满足具有高方差的峰值需求。我们应对这一挑战的思路是,认识到不仅劳动力排班,工作地点也可以通过开发一个动态劳动力调度与调配系统来动态优化;该系统由传感器更新数据以及动态更新的枢纽到达需求预测提供输入。本文提出了新颖的反应式调度启发式方法,用于在超互联包裹物流枢纽中将预测到达量与班次动态匹配。动态调度和分配机制在配送期间动态执行,以便在时空上调整可用劳动力。我们还引入惩罚成本以保证包裹及时分拣,并提前进行调度调整,从而为人员规划留出充足时间。为评估所提出的方法,我们基于中国一家物流公司的真实包裹物流网络开展了综合案例研究。结果表明,在计算时间有限的枢纽中,我们提出的方法能够显著优于传统劳动力调度策略。
英文摘要:
With the development of e-commerce during the Covid-19 pandemic, one of the major challenges for many parcel logistics companies is to design reliable and flexible scheduling algorithms to meet uncertainties of parcel arrivals as well as manpower supplies in logistic hubs, especially for those depending on workforce greatly. Currently, most labor scheduling is periodic and limited to single facility, thus the number of required workers in each hub is constrained to meet the peak demand with high variance. We approach this challenge, recognizing that not only workforce schedules but also working locations could be dynamically optimized by developing a dynamic workforce scheduling and relocation system, fed from updated data with sensors and dynamically updated hub arrival demand predictions. In this paper, we propose novel reactive scheduling heuristics to dynamically match predicted arrivals with shifts at hyperconnected parcel logistics hubs. Dynamic scheduling and allocation mechanisms are carried out dynamically during delivery periods to spatiotemporally adjust the available workforce. We also include penalty costs to keep parcels sorted in time and scheduling adjustments are made in advance to allow sufficient time for crew planning. To assess the proposed methods, we conduct comprehensive case studies based on real-world parcel logistic networks of a logistic company in China. The results show that our proposed approach can significantly outperform traditional workforce scheduling strategies in hubs with limited computation time.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。