使用混合有限元与物质点方法对尾矿坝液化诱导泥流进行建模

Modeling liquefaction-induced runout of a tailings dam using a hybrid finite element and material point method approach

Brent Sordo, Ellen Rathje, Krishna Kumar

AI总结:

本文提出一种结合有限元法与物质点法的顺序混合方法,以克服单一方法在大变形和液化起始预测中的局限,并通过对1978年Mochikoshi尾矿坝溃坝建模验证其模拟尾矿坝从液化起始到泥流全过程的效能。

摘要:

尾矿坝蓄积大量饱和土壤,极易发生液化。液化导致挡土强度严重丧失,可能引发大坝失稳。一旦溃坝,液化土体形成大规模泥石流倾泻而下,对下游造成灾难性后果。数值模型常用于预测尾矿坝液化响应及潜在泥流,为避险减灾工程决策提供依据。有限元法(FEM)是广泛使用的工具,擅长模拟液化触发及初始运动,但在大变形模拟中因网格畸变迅速丧失精度。相反,物质点法(MPM)作为一种混合欧拉-拉格朗日方法,采用可在背景网格上自由移动的粒子,能无精度损失地处理大变形。然而,MPM应力分布的精度问题及可用边界条件的限制削弱了其预测液化起始的能力。本文采用FEM与MPM的顺序混合方法,作为优于单一方法的更优替代。为验证该混合方法模拟尾矿坝从起始到泥流全过程的效能,我们对1978年Mochikoshi尾矿坝溃坝进行了建模。

英文摘要:

Tailings dams impound large amounts of saturated soil which can be highly susceptible to liquefaction. Liquefaction results in a severe loss of strength in the retained soil and potentially failure of the dam. If the dam is breached, a massive debris flow of liquefied soil is then released with potentially disastrous consequences downstream. Numerical models are frequently utilized to predict the liquefaction response of tailings dams and the potential runout, and these analyses inform engineering decisions regarding hazard avoidance and mitigation. The Finite Element Method (FEM) is a widespread tool which excels at modeling liquefaction triggering and initial movements, but it quickly loses accuracy when modeling large deformations due to mesh distortion. Conversely, the Material Point Method (MPM), a hybrid Eulerian-Lagrangian method, employs particles that move freely across a background grid and can account for large deformations without losing accuracy. However, issues with the accuracy of MPM's stress distributions and limits associated with the available boundary conditions impair its ability to predict liquefaction initiation. In this paper, we utilize a sequential hybridization of the FEM and MPM methods as a superior alternative to either individually. To demonstrate the efficacy of this hybrid method to simulate the entire process of tailings dam failures from initiation to runout, we model the 1978 Mochikoshi Tailings Dam failure.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑