将仿真预算管理集成到鼓-缓冲-绳中:参数化与减少计算工作量的研究
Integrating Simulation Budget Management into Drum-Buffer-Rope: A Study on Parametrization and Reducing Computational Effort
AI总结:
本研究将仿真预算管理集成到鼓-缓冲-绳生产控制方法中,以减少寻找最优计划参数的计算工作量,并通过仿真验证了其在多种生产环境下的有效性。
摘要:
在制造业中,瓶颈工作站经常出现,使生产计划复杂化并增加成本。为了解决这个问题,鼓-缓冲-绳(DBR)是一种被广泛认可的生产计划与控制方法,其重点在于集中管理瓶颈工作站,从而提高生产系统的性能。尽管DBR主要专注于制定瓶颈计划,但计划参数的选择至关重要,因为它们显著影响调度过程。进行全面的全因子枚举以确定理想的计划参数需要大量的计算工作量。仿真预算管理(SBM)提供了一种有效的概念,通过跳过不太有前景的参数组合来减少这种工作量。本文介绍了一种将SBM集成到多阶段多项目、容量有限的DBR计划与控制生产系统中的方法,旨在确定最优计划参数。此外,我们进行了仿真研究,以分析不同生产系统环境(即不同的车间负载和过程不确定性水平)对DBR的性能和参数化以及SBM有效性的影响。我们的结果表明,与传统全因子枚举相比,在确定最优计划参数时,仿真预算显著减少。
英文摘要:
In manufacturing, a bottleneck workstation frequently emerges, complicating production planning and escalating costs. To address this, Drum-Buffer-Rope (DBR) is a widely recognized production planning and control method that focuses on centralizing the bottleneck workstation, thereby improving production system performance. Although DBR is primarily focused on cre-ating a bottleneck schedule, the selection of planning parameters is crucial, as they significantly influence the scheduling process. Conducting a compre-hensive full factorial enumeration to identify the ideal planning parameters requires substantial computational effort. Simulation Budget Management (SBM) offers an effective concept to reduce this effort by skipping less promising parameter combinations. This publication introduces a method for integrating SBM into multi-stage multi-item DBR planned and controlled production system with limited capacity, aimed at determining the optimal planning parameters. Furthermore, we conduct a simulation study to analyze the effects of different production system environments, i.e., varying levels of shop load and process uncertainty, on both the performance and parame-terization of DBR and the efficacy of SBM. Our results show significant re-duction in simulation budget for identifying optimal planning parameters compared to traditional full factorial enumeration.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。