面向 ATLAS NSW 探测器上供电需求,本文提出模块化、水冷、抗辐射且抗磁场的高密度 DC/DC 转换器,并通过电气参数测量及 CERN 辐射与强磁场测试验证其可靠性。

摘要:

新型探测器(例如 Micro Pattern Gas Detectors,MPGD,微图案气体探测器)中读出通道数量的增加达到数百万量级,需要大量电力为前端电子设备供电,功率高达数百 kW。如果这些电力在远离探测器的位置产生,连接电缆上的电压降会对供电电流、导线截面积和配电造成严格限制。电缆上的大量电压降除了会增加导线电阻上的功耗外,还会在电流瞬态情况下导致负载端的稳压问题。为缓解这些问题,研究人员开发了一款可在极端恶劣环境中工作、功率密度大于 200 W/dm3 的新一代 DC/DC 转换器。该转换器采用模块化设计,最多包含四个独立模块,每个模块有八个通道,集中安装在一个水冷机箱中,能够以 10 至 12 V 的可调输出为负载供电,每通道功率最高达 170 W。在本报告中,作者以 ATLAS New Small Wheel(NSW,新小轮)项目的环境、电气和机械要求为基础,分析了这种转换器的设计约束。热方面的考虑要求转换器采用水冷,而尺寸约束则迫使设计采用创新方案,将耗散热量传递至热交换器。控制与监测系统支持对转换器进行完整的远程管理。文中测量并报告了主要电气参数。该转换器还在恶劣工作环境中进行了特性测试:在 CERN CHARM 设施开展的辐射测试超过了 ATLAS 十年运行的估计限值,并在 CERN 使用不同磁体、以多种方向进行了最高达 1.3 T 的磁场测试。

英文摘要:

The increase in the number of readout channels in new detectors, like the Micro Pattern Gas Detectors (MPGD), in the order of several millions, requires a large amount of electrical power to supply the front-end electronics, up to hundreds kW. If this power is generated at long distances from the detector, the voltage drop on the connection cables puts serious constraints to the supply current, to the wire cross-section and to the power distribution. A large amount of voltage drop on the cables, apart an increased power dissipation on wire resistance, determines regulation issues on the load in case of current transients. To mitigate these problems, a new generation DC/DC converter, working in a heavily hostile environment and with a power density greater than 200 W/dm3, was developed. It is modular, with up to four independent modules, eight channels each, collected in a water-cooled crate, and can supply the load with an adjustable 10 to 12 V output up to 170 W per channel. In this contribution, the design constraints of such a converter are analysed, taking as a basis the environmental, electrical and mechanical requirements of the ATLAS New Small Wheel (NSW) project. Thermal considerations require the converter to be water-cooled, and the dimensional constraints impose the adoption of an innovative design to convey the dissipated heat towards the heat exchanger. The control and monitoring system allows for the full remote management of the converter. Main electrical parameters were measured and are reported. The converter was also characterized in a harsh working environment, with radiation tests in the CERN CHARM facility beyond the limits estimated for ten years operation in ATLAS, and with magnetic field tests in various orientations, using different magnets at CERN up to 1.3 T.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑