PANDA桶部DIRC探测器
The PANDA Barrel DIRC
AI总结:
本文介绍PANDA实验中用于带电粒子鉴别的桶部DIRC探测器,涵盖其熔融石英辐射条、球面透镜聚焦系统和MCP-PMT阵列设计,并通过模拟与束流测试验证性能,项目已进入部件制造阶段。
摘要:
位于德国达姆施塔特的欧洲国际反质子与离子研究装置(FAIR)上的PANDA实验将利用$\ar{p}p$湮灭来研究强子物理的基本问题。在大立体角和宽粒子动量范围内实现优异的粒子鉴别(PID)对于实现这一丰富物理计划的目标至关重要。靶区的带电粒子鉴别将由桶部DIRC(内部反射切伦科夫光探测)计数器提供。桶部DIRC覆盖22-140度的极角范围,对于动量高达3.5 GeV/c的带电粒子,将提供至少3个标准偏差的$π/K$分离能力。桶部DIRC的设计特点是采用合成熔融石英制成的窄辐射条、创新的多层球面透镜聚焦系统、棱柱形合成熔融石英扩展体,以及一组寿命增强型微通道板光电倍增管(MCP-PMT)阵列,用于探测切伦科夫光子的击中位置和到达时间。为研究系统性能,进行了详细的蒙特卡罗模拟并开发了重建方法。设计的所有关键方面和性能均已在CERN PS的混合强子束流中通过系统原型得到验证。2020年,PANDA桶部DIRC项目从设计阶段推进到部件制造阶段。熔融石英条的批量生产于2021年成功完成,MCP-PMT于2022年5月开始交付。
英文摘要:
The PANDA experiment at the international accelerator Facility for Antiproton and Ion Research in Europe (FAIR), Darmstadt, Germany, will address fundamental questions of hadron physics using $\bar{p}p$ annihilations. Excellent Particle Identification (PID) over a large range of solid angles and particle momenta will be essential to meet the objectives of the rich physics program. Charged PID in the target region will be provided by a Barrel DIRC (Detection of Internally Reflected Cherenkov light) counter. The Barrel DIRC, covering the polar angle range of 22-140 degrees, will provide a $π/K$ separation power of at least 3 standard deviations for charged particle momenta up to 3.5 GeV/c. The design of the Barrel DIRC features narrow radiator bars made from synthetic fused silica, an innovative multi-layer spherical lens focusing system, a prism-shaped synthetic fused silica expansion volume, and an array of lifetime-enhanced Microchannel Plate PMTs (MCP-PMTs) to detect the hit location and arrival time of the Cherenkov photons. Detailed Monte-Carlo simulations were performed, and reconstruction methods were developed to study the performance of the system. All critical aspects of the design and the performance were validated with system prototypes in a mixed hadron beam at the CERN PS. In 2020 the PANDA Barrel DIRC project advanced from the design stage to component fabrication. The series production of the fused silica bars was successfully completed in 2021 and delivery of the MCP-PMTs started in May 2022.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。