设计配电网络:需求同时性的影响
Designing Electricity Distribution Networks: The Impact of Demand Coincidence
AI总结:
本文提出DNRP-LSDC配电网络设计模型,基于瑞士真实网络与合成网络量化需求同时性对投资的影响,发现高同时性显著增加线路建设与成本。
摘要:
随着全球减少碳排放的努力,电动汽车和热泵等清洁技术正越来越多地被引入配电网络。这些技术显著增加了电力流,并可能导致更多的同时电力需求。本文分析了需求同时性的此类增加如何影响未来的配电网络投资。为此,我们开发了一种用于设计配电网络的新型模型,称为具有线路特定需求同时性的配电网络重构问题(DNRP-LSDC)。我们的分析分为两部分:(1)我们将模型应用于来自瑞士一家配电网络运营商的大量真实网络样本。我们发现,例如由大规模采用电动汽车导致的高需求同时性,需要建设大量新的网络线路,并使平均网络成本相较于现状增加84%。(2)我们使用一组合成网络来分离特定网络特征的影响。在此,我们表明高同时性对大型网络以及消费者地理密度较低的网络(例如农村地区存在的网络)具有更不利的影响。我们还表明,扩容措施对成本参数变化具有稳健性。我们的结果证明了制定降低需求同时性的政策和运行协议的必要性。此外,研究结果表明,配电网络运营商必须考虑新用电用途的需求同时性,并相应调整投资预算。在此,我们针对DNRP-LSDC问题的求解算法可以支持配电网络运营商完成战略性和运行性网络设计任务。
英文摘要:
With the global effort to reduce carbon emissions, clean technologies such as electric vehicles and heat pumps are increasingly introduced into electricity distribution networks. These technologies considerably increase electricity flows and can lead to more coincident electricity demand. In this paper, we analyze how such increases in demand coincidence impact future distribution network investments. For this purpose, we develop a novel model for designing electricity distribution networks, called the distribution network reconfiguration problem with line-specific demand coincidence (DNRP-LSDC). Our analysis is two-fold: (1) We apply our model to a large sample of real-world networks from a Swiss distribution network operator. We find that a high demand coincidence due to, for example, a large-scale uptake of electric vehicles, requires a substantial amount of new network line construction and increases average network cost by 84 % in comparison to the status quo. (2) We use a set of synthetic networks to isolate the effect of specific network characteristics. Here, we show that high coincidence has a more detrimental effect on large networks and on networks with low geographic consumer densities, as present in, e. g., rural areas. We also show that expansion measures are robust to variations in the cost parameters. Our results demonstrate the necessity of designing policies and operational protocols that reduce demand coincidence. Moreover, our findings show that operators of distribution networks must consider the demand coincidence of new electricity uses and adapt investment budgets accordingly. Here, our solution algorithms for the DNRP-LSDC problem can support operators of distribution networks in strategic and operational network design tasks.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。