混合地源热泵阵列在加州大学伯克利分校校园商业与法律节点能源系统中的应用潜力:一项初步研究
Application Potential of a Hybrid Ground Source Heat Pump Array for the UC Berkeley Campus Business and Law Node Energy System: A Preliminary Study
AI总结:
本研究针对加州大学伯克利分校商业与法律节点,结合建筑负荷模拟与优化方法设计混合地源热泵系统,验证了其可同时减少钻孔数量与电力消耗的应用潜力。
摘要:
当前规划将加州大学伯克利分校(UCB)校园能源系统划分为五个节点,本研究选取商业与法律节点作为研究对象,因其拥有可用于钻孔安装的开阔场地。研究采用太平洋西北国家实验室的Commercial Prototype Building Models(商业原型建筑模型),结合ASHRAE Standard 90.1-2013对应的模型特征(例如医院的高基础负荷、酒店的高生活热水负荷),估算UCB校园各类建筑的供暖和制冷负荷需求。通过EnergyPlus建筑能耗模拟生成未缩放的负荷曲线,再结合监测到的峰值负荷和年度能耗进行缩放,得到目标节点的逐时供暖和制冷负荷曲线。研究构建并求解了一个优化问题以设计混合GSHP(地源热泵)系统,其目标函数为系统的全寿命周期总成本,优化变量为GSHP系统承担的供暖和制冷负荷比例。基于优化结果,研究构建了空气源热泵和地源热泵系统的Modelica模型,用于开展详细案例研究:在Modelica模型中,需求侧连接至建筑内的散热器以传递热量,源侧则连接至GSHP、ASHP(空气源热泵)或其他供暖制冷设施。结果表明,合理配置的混合GSHP系统能够同时减少UCB校园场地的钻孔数量和电力消耗。
英文摘要:
The current plan divides the UC Berkeley (UCB) campus energy system into five nodes, where the Business and Law node was studied because of an open field site for borehole installation. The Pacific Northwest National Laboratory's Commercial Prototype Building Models were used to estimate heating and cooling load requirements for UCB campus building types by considering model characteristics (for example, high base load from hospitals, high DHW in hotels) corresponding to the ASHRAE Standard 90.1-2013. Unscaled load profiles were created from the EnergyPlus building energy simulation and scaled with monitored peak load and annual energy use to generate the target node's hourly heating and cooling load profiles. An optimization problem was solved to design a hybrid GSHP system, where the objective function is the lifetime total cost of the system, and the optimization variables are the portion of heating and cooling loads covered by the GSHP system. Modelica models for air source and ground source heat pump systems were built for detailed case studies based on optimization results. In the Modelica model, the demand side is connected to the radiators in the building to transfer heat, and the source side is connected to GSHP, ASHP, or other heating and cooling facilities. The results demonstrate that an appropriate hybrid GSHP system can help reduce both borehole numbers and electricity consumption for the UCB campus site.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。