弹性电网恢复规划中的故障点检测
Fault Point Detection for Recovery Planning of Resilient Grid
AI总结:
针对自然灾害导致的停电损失,提出PACEM方法利用电杆倾斜数据估算故障点间行进成本,使恢复时间减少28%。
摘要:
全球范围内大规模气象灾害日益增多,日本因台风、地震等自然灾害导致的停电损失也在增加。为应对减少停电经济损失的需求,我们正在推进弹性电网研究,以最小化停电持续时间。在本报告中,我们提出PACEM(电杆感知移动成本估计方法),该方法基于电杆安装传感器获取的电杆倾斜角度和方向以及道路状况数据,来确定故障点之间的行进成本。评估结果显示,在目标区域内,总恢复时间可减少28%。
英文摘要:
Large-scale meteorological disasters are increasing around the world, and power outage damage by natural disaster such as typhoons and earthquakes is increasing in Japan as well. Corresponding to the need of reduction of economic losses due to power outages, we are promoting research of resilient grids that minimizes power outage duration. In this report, we propose PACEM (Poles-Aware moving Cost Estimation Method) for determining travel costs between failure points based on the tilt angle and direction of electric poles obtained from pole-mounted sensors and road condition data. Evaluation result shows that the total recovery time can be reduced by 28% in the target area.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。