基于时刻表的铁路网络设计问题的复杂性
The complexity of the Timetable-Based Railway Network Design Problem
AI总结:
研究在容量约束和不确定时刻表下的铁路基础设施鲁棒网络设计问题,证明其为NP-hard并提出基于场景的整数线性规划优化方法。
摘要:
由于规划周期长且生命周期长,铁路基础设施必须提前很久进行规划。目前,在设计基础设施时,对预期运营情况的了解还很少。因此,时刻表和运营需要适应基础设施。由于铁路基础设施扩建措施的空间、时间和资金有限,每一次修改都必须谨慎且持久,并应适应未来未知的需求。考虑到这一点,我们提出了在容量约束和不确定时刻表下的铁路基础设施鲁棒网络设计问题。在此,我们为不确定的长期时刻表规划所需的扩建措施。我们证明了该问题是NP-hard的,即使限制在二部图和非常简单的时刻表下也是如此,并提出了更容易求解的特殊情况。该问题对应于固定费用网络设计问题,其中扩建成本被最小化,使得时刻表是可执行的。我们使用时间扩展网络通过整数线性规划对该问题进行建模。为了纳入未来时刻表的不确定性,我们使用基于场景的方法。我们定义了具有各自出发和到达时间以及可选列车的场景。然后对网络进行优化,使得在最小化扩建成本和未排程的可选列车的潜在惩罚成本的同时,能够运营给定百分比的场景。
英文摘要:
Because of the long planning periods and their long life cycle, railway infrastructure has to be outlined long ahead. At the present, the infrastructure is designed while only little about the intended operation is known. Hence, the timetable and the operation are adjusted to the infrastructure. Since space, time and money for extension measures of railway infrastructure are limited, each modification has to be done carefully and long lasting and should be appropriate for the future unknown demand. To take this into account, we present the robust network design problem for railway infrastructure under capacity constraints and uncertain timetables. Here, we plan the required expansion measures for an uncertain long-term timetable. We show that this problem is NP-hard even when restricted to bipartite graphs and very simple timetables and present easier solvable special cases. This problem corresponds to the fixed-charge network design problem where the expansion costs are minimized such that the timetable is conductible. We model this problem by an integer linear program using time expanded networks. To incorporate the uncertainty of the future timetable, we use a scenario-based approach. We define scenarios with individual departure and arrival times and optional trains. The network is then optimized such that a given percentage of the scenarios can be operated while minimizing the expansion costs and potential penalty costs for not scheduled optional trains.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。