arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2304.10271cs.SE
收藏

基于显著性的利益相关者选择,以在解决下一版本问题时保持利益相关者覆盖度

Salience-based stakeholder selection to maintain stakeholder coverage in solving the next release problem

IM del Aguila, J del Sagrado

AI总结:

针对下一版本问题中利益相关者数量庞大、权重难以全部纳入的问题,提出基于权力、合法性和紧迫性的显著性聚类分组方法,在保持需求选择覆盖度的同时显著减少需管理的利益相关者数量。

摘要:

利益相关者量化在选择适当需求方面发挥着基础性作用,因为他们的判断是一项主要标准,而并非所有利益相关者都具有相同的重要性。最初的方案通过为利益相关者分配权重来对其进行量化。然而,实际项目管理着数量众多的利益相关者群体,这阻碍了纳入他们所有人的权重。本文提出将分组策略作为一种手段,以减少需求选择中需要管理的利益相关者数量,同时保持适当的覆盖度(即选择满足利益相关者需求的程度)。我们的方法基于利益相关者的显著性,该显著性依据权力、合法性和紧迫性属性来定义。在一个具体项目中,应用了多种策略来选择重要的利益相关者群体。在基于验证指标确定聚类数量(4个和3个)之后,我们使用了 k-means、k-medoids 和层次聚类。针对所有利益相关者以及每个重要群体,求解了若干个需求选择优化问题。测试发现,无论采用何种技术和群体数量,使用聚类筛选重要利益相关者时,覆盖度均无显著差异,同时被考虑的利益相关者数量减少了66.32%至87.75%。对从真实世界项目获得的数据应用聚类方法,有助于识别重要利益相关者群体。所建议的群体数量与利益相关者理论相符,并且需求选择中的覆盖度值得以保持。

英文摘要:

Stakeholders quantification plays a basic role in selecting the appropriate requirements because their judgement is a major criteria since not all of them have the same importance. Original proposals quantified stakeholders assigning them a weight. Nonetheless, actual projects manage a numerous stakeholders community hindering the inclusion of all their weights. This work proposes grouping strategies as means to reduce the number of stakeholders to manage in requirements selection keeping a proper coverage (i.e. howthe selection fulfils stakeholder demands). Our approach is based on stakeholders' salience, defined in terms of power, legitimacy and urgency attributes. Diverse strategies are applied selecting important stakeholders groups in a specific project. We use k-means}, k-medoids and hierarchical clustering, after deciding the number of cluster (4 and 3) based on validation indices. Either for all the stakeholders and each important group several requirements selection optimization problems have been solved. Tests find no significant differences for coverage when important stakeholders are filtered using clustering, regardless of the technique and number of groups, with a reduction between 66.32% to 87.75% in the number of stakeholders being considered. Applying clustering methods on data obtained from a real-world project is useful to identify the group of important stakeholders. The number of groups suggested matches the stakeholders theory and the coverage values in the requirements selection is kept.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑