SPIDER运行三年及首次MITICA集成测试的经验教训

Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

D. Marcuzzi, V. Toigo, M. Boldrin, G. Chitarin, S. Dal Bello, L. Grando, A. Luchetta, R. Pasqualotto, M. Pavei, G. Serianni, L. Zanotto, R. Agnello, P. Agostine… 展开作者

D. Marcuzzi, V. Toigo, M. Boldrin, G. Chitarin, S. Dal Bello, L. Grando, A. Luchetta, R. Pasqualotto, M. Pavei, G. Serianni, L. Zanotto, R. Agnello, P. Agostinetti, M. Agostini, D. Aprile, M. Barbisan, M. Battistella, G. Berton, M. Bigi, M. Brombin, V. Candela, V. Candeloro, A. Canton, R. Casagrande, C. Cavallini, R. Cavazzana, L. Cordaro, N. Cruz, M. Dalla Palma, M. Dan, A. De Lorenzi, R. Delogu, M. De Muri, M. De Nardi, S. Denizeau, M. Fadone, F. Fellin, A. Ferro, E. Gaio, C. Gasparrini, F. Gnesotto, P. Jain, A. La Rosa, D. Lopez-Bruna, R. Lorenzini, A. Maistrello, G. Manduchi, S. Manfrin, N. Marconato, I. Mario, G. Martini, R. Milazzo, T. Patton, S. Peruzzo, N. Pilan, A. Pimazzoni, C. Poggi, N. Pomaro, B. Pouradier-Duteil, M. Recchia, A. Rigoni-Garola, D. Rizzetto, A. Rizzolo, F. Santoro, E. Sartori, B. Segalini, A. Shepherd, M. Siragusa, P. Sonato, A. Sottocornola, E. Spada, S. Spagnolo, M. Spolaore, C. Taliercio, P. Tinti, P. Tomsič, L. Trevisan, M. Ugoletti, M. Valente, M. Valisa, F. Veronese, M. Vignando, P. Zaccaria, R. Zagorski, B. Zaniol, M. Zaupa, M. Zuin, M. Cavenago, D. Boilson, C. Rotti, H. Decamps, F. Geli, A. Sharma, P. Veltri, J. Zacks, M. Simon, F. Paolucci, A. Garbuglia, D. Gutierrez, A. Masiello, G. Mico, C. Labate, P. Readman, E. Bragulat, L. Bailly-Maitre, G. Gomez, G. Kouzmenko, F. Albajar, M. Kashiwagi, H. Tobari, A. Kojima, M. Murayama, S. Hatakeyama, E. Oshita, T. Maejima, N. Shibata, Y. Yamashita, K. Watanabe, N. P. Singh, M. J. Singh, H. Dhola, U. Fantz, B. Heinemann, C. Wimmer, D. Wünderlich, K. Tsumori, G. Croci, G. Gorini, A. Muraro, M. Rebai, M. Tardocchi, L. Giacomelli, D. Rigamonti, F. Taccogna, D. Bruno, M. Rutigliano, S. Longo, S. Deambrosis, E. Miorin, F. Montagner, A. Tonti, F. Panin

AI总结:

本文总结了SPIDER三年运行经验及MITICA首次集成测试结果,针对ITER中性束注入器的高功率需求,通过实验改进设计并解决1MV电源系统问题,为ITER NBI成功运行提供关键支持。

摘要:

ITER计划使用两个加热中性束注入器及一个可选注入器,作为辅助加热与电流驱动系统的一部分。每个注入器预期的16.5 MW中性束功率远高于全球现有设施。Consorzio RFX建立了中性束测试设施(NBTF),利用SPIDER和MITICA两个测试台的协同作用。SPIDER致力于在ITER相关条件下开发和表征大型高效负离子源:源和加速器位于同一真空环境中,多射频(RF)天线对电磁干扰的免疫,以及避免源外部的RF诱导放电。SPIDER三年的实验针对实现全性能所需的设计修改。目前源处于长期停机阶段,以整合实验活动的经验。同时,MITICA作为ITER NBI的全尺寸原型,配备1 MV加速器和离子中和器,其开发正在进行中,包括舱内组件制造,而电源和辅助系统已进入最终测试和调试阶段。1MV电源的集成、调试和测试对于这一在研究和工业领域均无先例的系统至关重要。通过结合逆变器系统、直流发电机和传输线确认1MV输出的集成测试,发现了部分组件的错误/事故。为实现ITER的具体系统,开发了系统修复和改进的解决方案。因此,NBTF正成为一个必要设施,因与现有注入器差距巨大,专门用于识别问题并找到解决方案,以在时间约束内实现成功的ITER NBI运行。

英文摘要:

ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.