Graph Neural Networks for the Offline Nanosatellite Task Scheduling Problem
Department of Automation and Systems Engineering, Federal University of Santa Catarina (UFSC)(自动化与系统工程系,圣卡塔琳娜联邦大学);Department of Electrical Engineering, Federal University of Santa Catarina (UFSC)(电气工程系,圣卡塔琳娜联邦大学);Department of Electrical Engineering, Federal University of Parana (UFPR)(电气工程系,巴西南里奥格兰德联邦大学)
Bruno Machado Pacheco, Laio Oriel Seman, Cezar Antonio Rigo, Eduardo Camponogara, Eduardo Augusto Bezerra, Leandro dos Santos Coelho
This study investigates how to schedule nanosatellite tasks more efficiently using Graph Neural Networks (GNNs). In the Offline Nanosatellite Task Scheduling (ONTS) problem, the goal is to find the optimal schedule for tasks to be carried out in orbit while taking into account Quality-of-Service (QoS) considerations such as priority, minimum and maximum activation events, execution time-frames, periods, and execution windows, as well as constraints on the satellite's power resources and the complexity of energy harvesting and management. The ONTS problem has been approached using conventional mathematical formulations and exact methods, but their applicability to challenging cases of the problem is limited. This study examines the use of GNNs in this context, which has been effectively applied to optimization problems such as the traveling salesman, scheduling, and facility placement problems. More specifically, we investigate whether GNNs can learn the complex structure of the ONTS problem with respect to feasibility and optimality of candidate solutions. Furthermore, we evaluate using GNN-based heuristic solutions to provide better solutions (w.r.t. the objective value) to the ONTS problem and reduce the optimization cost. Our experiments show that GNNs are not only able to learn feasibility and optimality for instances of the ONTS problem, but they can generalize to harder instances than those seen during training. Furthermore, the GNN-based heuristics improved the expected objective value of the best solution found under the time limit in 45%, and reduced the expected time to find a feasible solution in 35%, when compared to the SCIP (Solving Constraint Integer Programs) solver in its off-the-shelf configuration
RL-MSA: a Reinforcement Learning-based Multi-line bus Scheduling Approach
School of Computer Science, Beijing University of Posts and Telecommunications(北京邮电大学计算机学院);Key Laboratory of Trustworthy Distributed Computing and Service, Ministry of Education, China(教育部可信分布式计算与服务重点实验室)
Self-Driving Telescopes: Autonomous Scheduling of Astronomical Observation Campaigns with Offline Reinforcement Learning
University of Pisa(比萨大学);Fermi National Accelerator Laboratory(费米国家加速器实验室);Kavli Institute for Cosmological Physics(卡夫利宇宙物理研究所);University of Chicago(芝加哥大学);Space Telescope Science Institute(太空望远镜科学研究所)
The Pump Scheduling Problem: A Real-World Scenario for Reinforcement Learning
Normandie Université(诺曼底大学);INSA Rouen(里昂大学鲁昂分校);LITIS Rouen(鲁昂LITIS研究所);Technical University of Kaiserslautern(凯撒斯劳滕技术大学);SAM Kaiserlaustern(凯撒斯劳滕SAM)
Adapting to Dynamic LEO-B5G Systems: Meta-Critic Learning Based Efficient Resource Scheduling
Interdisciplinary Centre for Security, Reliability and Trust, Luxembourg University(卢森堡大学安全、可靠性与跨学科信任中心);School of Computer Science and Engineering, University of Electronic Science and Technology of China(电子科技大学计算机科学与工程学院);Faculty of Information Technology, University of Jyväskylä(于韦斯屈莱大学信息技术学院);Institute for Infocomm Research, Agency for Science, Technology, and Research, Singapore(新加坡科技研究局信息通信研究院)
Dynamic Scheduling for Vehicle-to-Vehicle Communications Enhanced Federated Learning
Beijing National Research Center for Information Science and Technology, Department of Electronic Engineering, Tsinghua University(北京信息科学与技术国家研究中心,电子工程系,清华大学);School of Electronic and Information Engineering, Beijing Jiaotong University(电子信息工程学院,北京交通大学)