在模型不确定性下,桥接POMDPs和贝叶斯决策用于鲁棒维护计划:在铁路系统中的应用
Bridging POMDPs and Bayesian decision making for robust maintenance planning under model uncertainty: An application to railway systems
摘要:
结构健康监测(SHM)描述了用于推断结构状况的可量化指标的过程,其可以用作支持关于基础设施资产的操作和维护的决策的输入。由于关键结构的寿命很长,这个问题可以被看作是一个连续的决策问题,在规定的范围。部分可观测马尔可夫决策过程(POMDPs)提供了一个正式的框架来解决潜在的最优规划任务。然而,两个问题可能会破坏POMDP解决方案。首先,需要一个模型,可以充分描述恶化或纠正措施下的结构条件的演变,其次,从可用的监测数据的观察过程参数的恢复的非平凡的任务。尽管存在这些潜在的挑战,但所采用的POMDP模型通常不考虑模型参数的不确定性,导致解决方案可能不切实际地自信。在这项工作中,我们解决了这两个关键问题。我们提出了一个框架,估计POMDP过渡和观察模型参数直接从现有的数据,通过马尔可夫链蒙特卡罗(MCMC)采样的隐马尔可夫模型(HMM)的条件下的行动。MCMC推断估计所涉及的模型参数的分布。然后,我们形成并解决POMDP问题,利用推断的分布,推导出的解决方案,是强大的模型的不确定性。我们成功地应用我们的方法对铁路轨道资产的维修规划的基础上的“分形值”指标,这是从实际的铁路监测数据计算。
英文摘要:
Structural Health Monitoring (SHM) describes a process for inferring quantifiable metrics of structural condition, which can serve as input to support decisions on the operation and maintenance of infrastructure assets. Given the long lifespan of critical structures, this problem can be cast as a sequential decision making problem over prescribed horizons. Partially Observable Markov Decision Processes (POMDPs) offer a formal framework to solve the underlying optimal planning task. However, two issues can undermine the POMDP solutions. Firstly, the need for a model that can adequately describe the evolution of the structural condition under deterioration or corrective actions and, secondly, the non-trivial task of recovery of the observation process parameters from available monitoring data. Despite these potential challenges, the adopted POMDP models do not typically account for uncertainty on model parameters, leading to solutions which can be unrealistically confident. In this work, we address both key issues. We present a framework to estimate POMDP transition and observation model parameters directly from available data, via Markov Chain Monte Carlo (MCMC) sampling of a Hidden Markov Model (HMM) conditioned on actions. The MCMC inference estimates distributions of the involved model parameters. We then form and solve the POMDP problem by exploiting the inferred distributions, to derive solutions that are robust to model uncertainty. We successfully apply our approach on maintenance planning for railway track assets on the basis of a "fractal value" indicator, which is computed from actual railway monitoring data.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。