arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2211.08800cs.DC
收藏

利用长路径确定DAG任务响应时间的界

Bounding the Response Time of DAG Tasks Using Long Paths

Qingqiang He, Nan Guan, Mingsong Lv, Xu Jiang, Wanli Chang

摘要:

1969年,Graham利用DAG任务的总工作量和最长路径,提出了著名的DAG任务响应时间界,并被广泛应用于解决基于DAG任务系统的调度和分析问题。本文提出了一个新的响应时间界的DAG任务使用的总工作量和多个长路径的DAG的长度,而不是最长的格雷厄姆界。我们的新边界理论上占主导地位,经验优于格雷厄姆的界限。我们进一步扩展所提出的方法多DAG任务系统。我们的可扩展性测试理论上占主导地位的联邦调度和优于国家的最先进的相当大的利润。

英文摘要:

In 1969, Graham developed a well-known response time bound for a DAG task using the total workload and the longest path of the DAG, which has been widely applied to solve many scheduling and analysis problems of DAG-based task systems. This paper presents a new response time bound for a DAG task using the total workload and the lengths of multiple long paths of the DAG, instead of the longest path in Graham's bound. Our new bound theoretically dominates and empirically outperforms Graham's bound. We further extend the proposed approach to multi-DAG task systems. Our schedulability test theoretically dominates federated scheduling and outperforms the state-of-the-art by a considerable margin.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑