arXiv 2208.04673astro-ph.IM
收藏

NIRSpec微型快门阵列的飞行性能

In-flight performance of the NIRSpec Micro Shutter Array

Timothy D. Rawle, Giovanna Giardino, David E. Franz, Robert Rapp, Maurice te Plate, Christian A. Zincke, Yasin M. Abul-Huda, Catarina Alves de Oliveira, Katie B… 展开作者

Timothy D. Rawle, Giovanna Giardino, David E. Franz, Robert Rapp, Maurice te Plate, Christian A. Zincke, Yasin M. Abul-Huda, Catarina Alves de Oliveira, Katie Bechtold, Tracy Beck, Stephan M. Birkmann, Torsten Böker, Ralf Ehrenwinkler, Pierre Ferruit, Dennis Garland, Peter Jakobsen, Diane Karakla, Hermann Karl, Charles D. Keyes, Robert Koehler, Nimisha Kumari, Nora Lützgendorf, Elena Manjavacas, Anthony Marston, S. Harvey Moseley, Peter Mosner, James Muzerolle, Patrick Ogle, Charles Proffitt, Elena Sabbi, Marco Sirianni, Glenn Wahlgren, Emily Wislowski, Raymond H. Wright, Chi Rai Wu, Peter Zeidler

摘要:

詹姆斯·韦伯太空望远镜(JWST)上的NIRSpec仪器将第一台多目标光谱仪(MOS)带入太空,由约250,000个单独孔径的可编程微快门阵列(MSA)实现。在6个月的调试期间,MSA表现出色,完成了约800次重新配置,平均成功率约为96%,以科学的方式命令百叶窗打开。我们发现,82.5%的unvignetted快门人口是可用于科学,与电气短掩蔽现在的主要原因,无法操作的光圈。作为回应,我们提出了一项计划,在标称操作期间重新检查现有的短路,预计将减少受影响的百叶窗数量。我们还提出了一个全面的评估失败的开放和失败的关闭快门人口,这两者都显示出与地面测试的预测边际增长。我们建议对关闭失败的百叶窗标记方案进行修改,以提高MSA配置规划的灵活性。总的来说,NIRSpec MSA在调试期间表现非常好,MOS模式被宣布为按计划进行科学操作。

英文摘要:

The NIRSpec instrument on the James Webb Space Telescope (JWST) brings the first multi-object spectrograph (MOS) into space, enabled by a programmable Micro Shutter Array (MSA) of ~250,000 individual apertures. During the 6-month Commissioning period, the MSA performed admirably, completing ~800 reconfigurations with an average success rate of ~96% for commanding shutters open in science-like patterns. We show that 82.5% of the unvignetted shutter population is usable for science, with electrical short masking now the primary cause of inoperable apertures. In response, we propose a plan to recheck existing shorts during nominal operations, which is expected to reduce the number of affected shutters. We also present a full assessment of the Failed Open and Failed Closed shutter populations, which both show a marginal increase in line with predictions from ground testing. We suggest an amendment to the Failed Closed shutter flagging scheme to improve flexibility for MSA configuration planning. Overall, the NIRSpec MSA performed very well during Commissioning, and the MOS mode was declared ready for science operations on schedule.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑