arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2203.06253physics.acc-ph
收藏

基于快循环HTS的超导加速器磁体:由中微子物理学和μ子对撞机需求驱动的可行性研究和准备就绪演示计划

Fast cycling HTS based superconducting accelerator magnets: Feasibility study and readiness demonstration program driven by neutrino physics and muon collider needs

Henryk Piekarz, Bradley Claypool, Steven Hays, Matthew Kufer, Vladimir Shiltsev, Alexander Zlobin, Lucio Rossi

摘要:

高能效快循环加速器磁体的开发对下一代中微子研究质子快循环同步加速器(RCS)和未来μ子对撞机的助推加速器至关重要。我们看到了一个独特的机会,有这样的磁铁建立在高温超导体(HTS)的基础上。除了在相对较高的温度下具有超导性之外,与低温NbTi超导体电缆相比,稀土高温超导带显示出非常小的交流损耗。最近对基于HTS的0.5 m长双孔超导加速器磁体的测试表明,在10 Hz重复频率和0.5 T B场跨度下,具有约300 T/s的高dB/dt斜坡率。在6 K冷却中没有观察到温度升高He在0.003K误差内,将磁体导体线圈中的低温功率损耗的上限设置为小于0.2W/m。基于这一结果,我们概述了该测试磁体设计的可能升级,即在10 mm束隙中将其升级为2 T B场,dB/dt斜升速率高达1000 T/s。该短样品磁体的功率测试结果将用于预测低温和电功率损耗,作为磁体B场和dB/dt斜升速率的函数。然后,这些预测将被缩放到预期的加速器磁体束隙和质子和μ子RCS加速器的B场的范围。我们邀请合作者加入这些研究,并呼吁支持旨在全面展示这种方法的研发计划,包括到2028年对基于HTS的快速循环加速器磁体的长原型进行设计,建造和功率测试。

英文摘要:

Development of energy-efficient fast cycling accelerator magnets is critical for the next generation of proton rapid cycling synchrotrons (RCS) for neutrino research and booster accelerators of future muon colliders. We see a unique opportunity for having such magnets to be built on base of High Temperature Superconductors (HTS). Besides being superconducting at relatively high temperatures, rare-earth HTS tapes have shown very small AC losses compared to low-temperature NbTi superconductor cables. Recent tests of the HTS-based 0.5 m long two-bore superconducting accelerator magnet have shown record high dB/dt ramping rates of about 300 T/s at 10 Hz repetition rate and 0.5 T B-field span. No temperature rise in 6 K cooling He was observed within the 0.003 K error setting the upper limit on the cryogenic power loss in the magnet conductor coil to be less than 0.2 W/m. Based on this result we outline a possible upgrade of this test magnet design to 2 T B-field in the 10 mm beam gap with the dB/dt ramping rates up to 1000 T/s. The power test results of this short sample magnet will be used to project both cryogenic and electrical power losses as a function of the magnet B-field and the dB/dt ramping rates. Then these projections will be scaled to the range of expected accelerator magnet beam gaps and B-fields for the proton and muon RCS accelerators. We invite collaborators to join these studies and call for support of the R&D program aimed at comprehensive demonstration of this approach that includes design, construction, and power tests of a long prototype of the HTS-based fast-cycling accelerator magnet by 2028.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑