IFMIF/EVEDA工程设计活动的完成:欧洲日本Li(d,xn)聚变相关中子源项目
The accomplishment of the Engineering Design Activities of IFMIF/EVEDA: The European Japanese project towards a Li(d,xn) fusion relevant neutron source
摘要:
国际聚变材料辐照设施(IFMIF),目前在欧洲和日本之间的更广泛的方法协议的框架下,其工程验证和工程设计活动(EVEDA)阶段,于2013年夏天如期完成,其EDA阶段发布IFMIF工厂的工程设计报告,这里描述。对前几个阶段的设计进行了许多改进,特别是由于超导加速器概念,减少了束流损失和运行成本,将淬火槽重新定位在试验室(TC)之外,减少了氚库存,并简化了故障情况下的更换,辐射模块与屏蔽块的分离获得了辐射灵活性并增强了远程处理设备的可靠性和成本降低,以及内衬的水冷却和TC的生物屏蔽,提高了相关子系统的效率和经济性。此外,已修改维护策略,以缩短辐照操作的年度停止时间,并对辐照样品进行更仔细的管理。IFMIF工厂的设计与IFMIF/EVEDA于2007年6月生效以来开展的EVA阶段密切相关。
英文摘要:
The International Fusion Materials Irradiation Facility (IFMIF), presently in its Engineering Validation and Engineering Design Activities (EVEDA) phase under the frame of the Broader Approach Agreement between Europe and Japan, accomplished in summer 2013, on schedule, its EDA phase with the release of the engineering design report of the IFMIF plant, which is here described. Many improvements of the design from former phases are implemented, particularly a reduction of beam losses and operational costs thanks to the superconducting accelerator concept, the re-location of the quench tank outside the test cell (TC) with a reduction of tritium inventory and a simplification on its replacement in case of failure, the separation of the irradiation modules from the shielding block gaining irradiation flexibility and enhancement of the remote handling equipment reliability and cost reduction, and the water cooling of the liner and biological shielding of the TC, enhancing the efficiency and economy of the related sub-systems. In addition, the maintenance strategy has been modified to allow a shorter yearly stop of the irradiation operations and a more careful management of the irradiated samples. The design of the IFMIF plant is intimately linked with the EVA phase carried out since the entry into force of IFMIF/EVEDA in June 2007.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。