Dijkstra-Through-Time:确定性工作负载的提前硬件调度方法
Dijkstra-Through-Time: Ahead of time hardware scheduling method for deterministic workloads
摘要:
以前大多数关于机器学习硬件加速器的数据流优化的工作都试图找到算法重构,例如循环重新排序和循环平铺。然而,它们提供的分析和信息仍然处于非常高的水平,必须进一步将它们映射到硬件可以理解的指令上。本文提出了一种面向确定性工作负载的计算和存储映射算法--“Dijkstra-Through-Time”(DTT)。它提供了一个简单的实现,并支持具有复杂NoC配置的加速器,代价是漫长的编译过程。这篇初始论文说明了合并调度和数据缓存一致性机制以获得更优化的数据流的概念实现的证明。
英文摘要:
Most of the previous works on data flow optimizations for Machine Learning hardware accelerators try to find algorithmic re-factorization such as loop-reordering and loop-tiling. However, the analysis and information they provide are still at very high level and one must further map them onto instructions that hardware can understand. This paper presents "Dijkstra-Through-Time" (DTT), an ahead of time compute and memory scheduling-mapping algorithm for deterministic workloads. It provides a simple implementation and supports accelerators with complex NoC configurations, at the expense of a long compilation process. This initial paper illustrates a proof of concept implementation to merge scheduling and data cache coherence mechanisms to get more optimized data flows.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。