不确定条件下配电网采用蓄电池储能的决策
Decision making under uncertainty for deploying battery storage as a non-wire alternative in distribution networks
摘要:
印度等新兴市场和发展中经济体(EMDE)对电力的需求不断增长,导致配电网络出现负荷和拥堵问题,特别是在城市地区,这对可持续发展和经济增长产生了不利影响。这些经济体的电力公司在筹集升级拥挤网络所需的资金方面面临着独特的限制。电池储能已成为馈线升级的非有线替代方案(NWA)。本文提出了一个灵活的评估框架,用于配电网中的电池存储及其在EMDE配电网规划中的应用。我们评估存储作为NWA的价值,使用多阶段的决策过程,结合系统优化与马尔可夫决策过程(MDP),以确定需求增长的不确定性下的最低成本的网络升级策略。当应用于印度德里的馈线时,该方法突出了电池存储的成本效益,以管理负载增长,同时推迟网络投资。在2030年的低,中,高电池存储资本成本预测中,我们估计可以部署18至29 GWh的电池存储容量,以推迟11,752至15,914公里的中压配电馈线,这些馈线在2030年以60%或更多的安培容量加载,从而节省12%至16%的资本成本。有趣的是,降低存储资本成本并不总是增加NWA存储部署,因为网络容量限制限制了非高峰存储充电的机会。
英文摘要:
The growing demand for electricity in emerging markets and developing economies (EMDE) such as India is causing loading and congestion problems on distribution networks, particularly in urban locations, that adversely impact sustainable development and economic growth. Electric utilities in these economies face unique constraints regarding raising capital required to upgrade their congested networks. Battery storage has emerged as a non-wire alternative (NWA) to feeder upgrades. This article presents a flexible valuation framework for battery storage use in distribution networks and its application in the context of EMDE distribution network planning. We evaluate the value of storage as an NWA using a multi-stage decision making process that combines system optimization with markov-decision processes (MDP) to identify the least-cost network upgrade strategy under demand growth uncertainty. When applied to feeders in Delhi, India, the approach highlights the cost-effectiveness of battery storage to manage load growth while deferring network investments. Across the low, medium and high battery storage capital cost projections for 2030, we estimate that 18 to 29 GWh of battery storage capacity could be deployed to defer 11,752 to 15,914 km of medium voltage distribution feeder lines that are loaded at 60\% or more of their ampere capacity in 2030, resulting in 12 to 16\% capital cost savings. Interestingly, the lowering storage capital costs does not always increase NWA storage deployment, due to network capacity constraints limiting opportunities for off-peak storage charging.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。