中美洲区域电力互联系统模型验证研究
Model Validation Study for Central American Regional Electrical Interconnected System
摘要:
中美洲区域互联电力系统(SER)连接六个国家:危地马拉,萨尔瓦多,洪都拉斯,尼加拉瓜,哥斯达黎加和巴拿马,由区域系统运营商Ente Operador Regional(EOR)运营。由于其地理形状和主要输电线路的布局,SER具有弱网格,干扰很容易传播,对其可靠性提出了挑战。在面临这些可靠性挑战时,拥有准确的动态模型对于EOR非常重要。本文介绍了SER和墨西哥互联系统的互联级模型验证工作。墨西哥的详细等效模型被纳入EOR使用的现有SER规划模型中。然后,使用模拟的动态应变分析和真实的系统扰动数据验证所得到的模型。还开发了一套完全自动化的脚本,并与EOR工程师共享。这项工作有助于EOR改进其验证常规实践,不断改进SER动态模型,从而提高其可靠性。
英文摘要:
The Central American Regional Interconnected Power System (SER) connects six countries: Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama, it is operated by the regional system operator Ente Operador Regional (EOR). Due to its geographical shape and layout of major transmission lines, SER has a weakly meshed grid, where disturbances can easily propagate, challenging its reliability. Having an accurate dynamic model is important for EOR when facing those reliability challenges. This paper describes interconnection-level model validation efforts for the SER and Mexico interconnected system. A detailed equivalent model of Mexico is incorporated in the existing SER planning model used by EOR. The resultant model is then validated using simulated dynamic contingency analysis and real system disturbance data. A fully automated suite of scripts is also developed and shared with EOR engineers. This work helps EOR improve their validation routine practices, to continuously improve SER dynamic model, and hence its reliability.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。