arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2103.02025eess.SYcs.SY
收藏

铁路信号劳动力的合理配置:资产管理的零基资源配置方法

Rightsizing the Railway Signal Workforce: a Zero-Based Resourcing Approach Towards Asset Management

Alex Lu, Zhiqi Zhong, Thomas Barger, Michael Brotzman

摘要:

传统的资产管理方法首先清点所有基础设施资产,然后分配维护任务和资源。我们的方法收集了类似的数据,但通过从当前的人员分配和描述他们的工作职责和工作流程开始,在铁路基础设施所有者-运营商环境中的工作人员阻力被最小化。由此产生的“人员配置模型”定量测量信号维护负担,包括联邦强制测试,故障单,非FRA维护,开销和假期覆盖,位置/轮班分配,行政流程,和工作宵禁生产力损失。它能够通过在轮班和维护基地位置之间合理分配劳动力来提供即时结果-甚至在所有资产正式清点之前。通勤客运铁路的典型数据表明,工作宵禁和轮班分配限制对劳动力生产率有显着影响。超过一半的信号维护工作时间用于联邦强制测试,而非FRA和维修维护各占约25%。这些指标提供了推动战略管理行动的情报,以提高信号维护的成本效益。该模型提供了基于工作量的员工分配,按工艺、位置、班组和班次供维护经理使用,还为预算过程中的职位设置或取消提供了分析基础。将其结果与当前员工工资单进行比较,可以衡量维护组织的人员配置压力有多大,这有助于衡量当前加班使用是否适当。在此过程中收集的资产和维护任务清单还可以为正常的资产管理过程提供信息,以评估更换周期、资产故障风险,并为战略和投资决策提供信息。

英文摘要:

Classic asset management approaches begin by inventorying all infrastructure assets and then assigning maintenance tasks and resources. Our approach collects similar data, but by starting with current personnel assignment and describing their job responsibilities and work processes, staff resistance in a railroad infrastructure owner-operator environment is minimized. Resulting "manning model" quantitatively measures signal maintenance burden including Federally mandated tests, trouble tickets, non-FRA maintenance, overhead and vacation coverage, location/shift assignment, administrative process, and work curfew productivity losses. It is capable of delivering immediate results by rightsizing allocation of workforce across shifts and maintenance base locations--even before all assets are formally inventoried. Typical data from a commuter passenger railroad shows that work curfews and shift assignment constraints have significant impacts on workforce productivity. Just over half of signal maintenance employee-hours are devoted to Federally mandated tests, whilst non-FRA and repair maintenance consumes about 25% each. These indicators provide intelligence driving strategic management actions to improve signal maintenance cost-effectiveness. This model provides workload-based employee assignment by craft, location, gang, and shift for maintenance manager use, but also provides analytical basis for establishing or abolishing positions in the budgeting process. Comparing its results with current employee payroll provides a measure of how much staffing stress the maintenance organization is under, which can help measure whether the current overtime usage is appropriate. Asset and maintenance task inventories collected in this process can also feed normal asset management processes to assess replacement cycles, asset failure risk, and to inform strategic and investment decisions.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑