This paper addresses a complex parallel machine scheduling problem with jobs divided into operations and operations grouped in families. Non-anticipatory family setup times are held at the beginning of each batch, defined by the combination of one setup-time and a sequence of operations from a unique family. Other aspects are also considered in the problem, such as release dates for operations and machines, operation's sizes, and machine's eligibility and capacity. We consider item availability to define the completion times of the operations within the batches, to minimize the total weighted completion time of jobs. We developed Iterated Greedy (IG) algorithms combining destroy and repair operators with a Random Variable Neighborhood Descent (RVND) local search procedure, using four neighborhood structures to solve the problem. The best algorithm variant outperforms the current literature methods for the problem, in terms of average deviation for the best solutions and computational times, in a known benchmark set of 72 instances. New upper bounds are also provided for some instances within this set. Besides, computational experiments are conducted to evaluate the proposed methods' performance in a more challenging set of instances introduced in this work. Two IG variants using a greedy repair operator showed superior performance with more than 70% of the best solutions found uniquely by these variants. Despite the simplicity, the method using the most common destruction and repair operators presented the best results in different evaluated criteria, highlighting its potential and applicability in solving a complex machine scheduling problem.
We consider the problem of dynamically scheduling J jobs on N processors for non-preemptive execution where the value of each job (or the reward garnered upon completion) decays over time. All jobs are initially available in a buffer and the distribution of their service times are known. When a processor becomes available, one must determine which free job to schedule so as to maximize the total expected reward accrued for the completion of all jobs. Such problems arise in diverse application areas, e.g. scheduling of patients for medical procedures, supply chains of perishable goods, packet s…
This paper proposes a dynamic primal-dual type algorithm to solve the optimal scheduling problem in wireless networks subject to uncertain parameters, which are generated by stochastic network processes such as random packet arrivals, channel fading, and node mobilities. The algorithm is a generalization of the well-known max-weight scheduling algorithm proposed by Tassiulas et al., where only queue length information is used for computing the schedules when the arrival rates are uncertain. Using the technique of fluid limits, sample path convergence of the algorithm to an arbitrarily close to…
The paper considers the problem of scheduling software modules on a multi-core processor, taking into account the limited bandwidth of the data bus and the precedence constraints. Two problem formulations with different levels of problem-specific detail are suggested and both shown to be NP-hard. A mixed integer linear programming (MILP) model is proposed for the first problem formulation, and a greedy algorithm is developed for the second one. An experimental comparison of the results of the greedy algorithm and the MILP solutions found by CPLEX solver is carried out.
In this paper we analyze the worst-case performance of a greedy algorithm called Largest-Z-ratio-First for the problem of scheduling unreliable jobs on m parallel machines. Each job is characterized by a success probability and a reward earned in the case of success. In the case of failure, the jobs subsequently sequenced on that machine cannot be performed. The objective is to maximize the expected reward. We show the algorithm provides an approximation ratio of approximately 0.853196, and that the bound is tight.
Control scheduling refers to the problem of assigning agents or actuators to act upon a dynamical system at specific times so as to minimize a quadratic control cost, such as the objective of the Linear-quadratic-Gaussian (LQG) or the Linear Quadratic Regulator (LQR). When budget or operational constraints are imposed on the schedule, this problem is in general NP-hard and its solution can therefore only be approximated even for moderately sized systems. The quality of this approximation depends on the structure of both the constraints and the objective. This work shows that greedy scheduling …
On parallel machine scheduling with variable energy consumption functions
University of Modena and Reggio Emilia(摩德纳和雷焦艾米利亚大学);Universidad Torcuato Di Tella(托尔夸托迪泰拉大学);Consejo Nacional de Investigaciones Científicas y Técnicas(国家科学研究委员会)
In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs is the worst-case objective function value from the set of all possible realizations of release and processing times. The objective function value is the total flow time of all jobs. We discuss some important properties of robust schedules for zero and non-zero release times, and illustrate the added complexity in robust scheduling given non-zero release time…
In this letter, we investigate the problem of actuator scheduling for networked control systems. Given a stochastic linear system with a number of actuators, we consider the case that one actuator is activated at each time. This problem is combinatorial in nature and NP hard to solve. We propose a convex relaxation to the actuator scheduling problem, and use its solution as a reference to design an algorithm for solving the original scheduling problem. Using dynamic programming arguments, we provide a suboptimality bound of our proposed algorithm. Furthermore, we show that our framework can be…
This paper presents a profound analysis of the robust job scheduling problem with uncertain release dates on unrelated machines. Our model involves minimizing the worst-case makespan and interval uncertainty where each release date belongs to a well-defined interval. Robust optimization requires scenario-based decision-making. A finite subset of feasible scenarios to determine the worst-case regret (a deviation from the optimal makespan) for a particular schedule is indicated. We formulate a mixed-integer nonlinear programming model to solve the underlying problem via three (constructive) gree…
We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and second-stage schedule with a minimum combined sum of completion times, such that at least Delta jobs share the same position in both schedules. We provide positive complexity results for some important special cases of this problem, as well as derive a 2-approximation algorithm to the full problem. Computational experiments examine the performance of an exact mixed-i…
This paper considers a discrete-time decision problem wherein a decision maker has to track, on average, a sequence of inputs selected from a convex set $\mathcal X \subset \mathbb{R}^d$ by choosing actions from a possibly non-convex feasible set $\mathcal Y\subset \mathbb{R}^d$, where $\mathcal X$ is in fact the convex hull of $\mathcal Y$. We study some generalized variants of this problem, in which: (i) $\mathcal X$ and $\mathcal Y$ vary with time, and (ii) there might be a delay between them, in the sense that $\mathcal X$ is the convex hull of the previous $\mathcal Y$. We investigate the…
We study the multi-level bottleneck assignment problem (MBA), which has important applications in scheduling and quantitative finance. Given a weight matrix, the task is to rearrange entries in each column such that the maximum sum of values in each row is as small as possible. We analyze the complexity of this problem in a generalized setting, where there are restrictions in how values in columns can be permuted. We present a lower bound on its approximability by giving a non-trivial gap reduction from three-dimensional matching to MBA. To solve MBA, a greedy method has been used in the liter…
In this paper, we consider the problem of scheduling real-time traffic in wireless networks under a conflict-graph interference model and single-hop traffic. The objective is to guarantee that at least a certain fraction of packets of each link are delivered within their deadlines, which is referred to as delivery ratio. This problem has been studied before under restrictive frame-based traffic models, or greedy maximal scheduling schemes like LDF (Largest-Deficit First) that provide poor delivery ratio for general traffic patterns. In this paper, we pursue a different approach through randomi…