arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2012.06312cs.LGcs.AI

Deep Reinforcement Learning for Long Term Hydropower Production Scheduling

SINTEF Digital(SINTEF数字);SINTEF Energy Research(SINTEF能源研究)

Signe Riemer-Sorensen, Gjert H. Rosenlund

英文摘要:

We explore the use of deep reinforcement learning to provide strategies for long term scheduling of hydropower production. We consider a use-case where the aim is to optimise the yearly revenue given week-by-week inflows to the reservoir and electricity prices. The challenge is to decide between immediate water release at the spot price of electricity and storing the water for later power production at an unknown price, given constraints on the system. We successfully train a soft actor-critic algorithm on a simplified scenario with historical data from the Nordic power market. The presented model is not ready to substitute traditional optimisation tools but demonstrates the complementary potential of reinforcement learning in the data-rich field of hydropower scheduling.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑