arXivDaily arXiv每日学术速递 周一至周五更新
今晚才能更新了~~大家休息下再来吧
arXiv 2011.02020math.OC
收藏

Exact and heuristic methods for Anchor-Robust and Adjustable-Robust RCPSP

Adèle Pass-Lanneau, Pascale Bendotti, Luca Brunod-Indrigo

英文摘要:

The concept of anchored solutions is proposed as a new robust optimization approach to the Resource-Constrained Project Scheduling Problem (RCPSP) under processing times uncertainty. The Anchor-Robust RCPSP is defined, to compute a baseline schedule with bounded makespan, sequencing decisions, and a max-size subset of jobs with guaranteed starting times, called anchored set. It is shown that the Adjustable-Robust RCPSP from the literature fits within the framework of anchored solutions. The Anchor-Robust RCPSP and the Adjustable-Robust RCPSP can benefit from each other to find both a worst-case makespan and a baseline schedule with an anchored set. A dedicated graph model for anchored solutions is proposed for budgeted uncertainty. Compact MIP reformulations are derived for both the Adjustable-Robust RCPSP and the Anchor-Robust RCPSP. Dedicated heuristics are designed based on the graph model. For both problems, the efficiency of the proposed MIP reformulations and heuristic approaches is assessed through numerical experiments on benchmark instances.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑