触发定标器模块在加速器定时中的应用
Applications of Triggered Scaler Module for Accelerator Timing
摘要:
自2006年以来,在日本质子加速器研究综合体(J-PARC)计时系统的运行过程中发生了意外的故障事件。然而,在众多疑似模块中,一直难以找到出现故障的模块。为了更容易地发现这样的故障模块,触发定标器模块,这是设计为PLC型I/O模块,被开发。这种类型的模块需要J-PARC主环(MR)慢周期(2.48/5.20 s)的启动信号和快周期(25 Hz)的启动信号作为参考信号,这些信号由J-PARC定时系统产生。模块中的定标器对机器周期中的输入脉冲数进行计数,并将其存储在存储器缓冲区中。2018年,使用注射器触发器和J-PARC MR的低水平射频(LLRF)信号对模块进行了评价,显示了预期结果。于二零二零年,本集团基于触发缩放器模块开发了两个应用程序。第一个是用于检测意外触发事件的应用程序,它成功地检测到了模拟的触发器故障事件。第二个是机器保护系统(MPS)中止信号的应用,表明该模块能够根据与加速器循环的关系可视化信号。两个应用程序显示了未来开发更多定制应用程序的可能性。本文提出了一种可用于其它加速器装置的便携式意外触发探测系统的设计思想。
英文摘要:
Since 2006, there have been unexpected trigger-failure events during the operation of the Japan Proton Accelerator Research Complex (J-PARC) timing system. However, among the many suspected modules, it has been difficult to find the one with the fault. To find such a faulty module more easily, the triggered scaler module, which was designed as a PLC-type I/O module, was developed. This type of module requires the start signal of the J-PARC main ring (MR) slow cycle (2.48/5.20 s) and the start signal of the rapid cycle (25 Hz) as reference signals, which are generated by the J-PARC timing system. A scaler in the module counts the number of input pulses during a machine cycle, and stores them in memory-buffers. In 2018, the module was evaluated using the trigger for injection kicker and the low-level radio frequency (LLRF) signal of J-PARC MR. The expected results were shown. In 2020, two applications were developed based on a triggered scaler module. The first one, an application for detecting unexpected-trigger events, successfully detected simulated trigger-failure events. The second one, an application for the abort signal of a machine protection system (MPS), showed that the module is capable of visualizing signals based on a relationship with the accelerator cycle. Two applications show possibilities for the development of more customized applications in the future. An idea to develop a portable unexpected-trigger detection system, which can be used in other accelerator facilities, is discussed herein.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。