arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2007.13453math.OCmath.CO
收藏

具有不确定交货期的鲁棒单机最大完工时间调度

Robust Single Machine Makespan Scheduling with Release Date Uncertainty

Oliver Bachtler, Sven O. Krumke, Huy Minh Le

摘要:

本文研究了具有不确定交货期的单机最大完工时间鲁棒调度问题。发布日期在已知间隔内取值。我们在两个不同的设置中使用伽马鲁棒性的概念,并解决了鲁棒绝对和鲁棒后悔标准。我们的主要结果是多项式时间算法具有相同的运行时间(O(n log n))的最佳算法的非鲁棒的情况下。

英文摘要:

This paper addresses the robust single machine makespan scheduling with uncertain release dates of the jobs. The release dates take values within know intervals. We use the concept of gamma-robustness in two different settings and address both the robust absolute and robust regret criteria. Our main results are polynomial time algorithms which have the same running time (O(n log n)) as the best algorithms for the non-robust case.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑