This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum w_jC_j$, is of great importance in practice, because it models a variety of real-life applications. Despite its importance, the $P|r_j|\sum w_jC_j$ has not received much attention in the recent literature. In this work, we fill this gap by proposing mixed integer linear programs and a tailored branch-and-price algorithm. Our {branch-and-price} relies on the decomposition of an arc-flow formulation and on the use of efficient exact and heuristic methods for solving the pricing subproblem. Computational experiments carried out on a set of randomly generated instances prove that the proposed methods can solve to the proven optimality instances with up to 200 jobs and 10 machines, and provide very low gaps for larger instances.
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm is proposed for this problem with a tight approximation bound. Polynomial solvability of the problem is proved in the case when each job on the first machine is in precedence relation with two jobs on the second machine.
In this paper we analyze the worst-case performance of a greedy algorithm called Largest-Z-ratio-First for the problem of scheduling unreliable jobs on m parallel machines. Each job is characterized by a success probability and a reward earned in the case of success. In the case of failure, the jobs subsequently sequenced on that machine cannot be performed. The objective is to maximize the expected reward. We show the algorithm provides an approximation ratio of approximately 0.853196, and that the bound is tight.
This paper addresses the scheduling problem of minimizing the total weighted tardiness on a single machine with step-deteriorating jobs. With the assumption of deterioration, the job processing times are modeled by step functions of job starting times and pre-specified job deteriorating dates. The introduction of step-deteriorating jobs makes a single machine total weighted tardiness problem more intractable. The computational complexity of this problem under consideration was not determined. In this study, it is firstly proved to be strongly NP-hard. Then a mixed integer programming model is …
We consider a problem that marries network flows and scheduling, motivated by the need to schedule maintenance activities in infrastructure networks, such as rail or general logistics networks. Network elements must undergo regular preventive maintenance, shutting down the arc for the duration of the activity. Careful coordination of these arc maintenance jobs can dramatically reduce the impact of such shutdown jobs on the flow carried by the network. Scheduling such jobs between given release dates and deadlines so as to maximize the total flow over time presents an intriguing case to study t…
We address the problem of scheduling jobs with non-identical sizes and distinct processing times on a single batch processing machine, aiming at minimizing the makespan. The extensive literature on this NP-hard problem mostly focuses on heuristics. Using an arc flow-based optimization approach, we construct an ingenious formulation that represents it as a problem of determining flows in graphs. The size of the formulation increases with the number of distinct sizes and processing times among the jobs, but it does not increase with the number of jobs, which makes it very effective to solve larg…
Consider a set of jobs with independent random service times to be scheduled on a single machine. The jobs can be surgeries in an operating room, patients' appointments in outpatient clinics, etc. The challenge is to determine the optimal sequence and appointment times of jobs to minimize some function of the server idle time and service start-time delay. We introduce a generalized objective function of delay and idle time, and consider $l_1$-type and $l_2$-type cost functions as special cases of interest. Determining an index-based policy for the optimal sequence in which to schedule jobs has…
We consider the problem of dynamically scheduling J jobs on N processors for non-preemptive execution where the value of each job (or the reward garnered upon completion) decays over time. All jobs are initially available in a buffer and the distribution of their service times are known. When a processor becomes available, one must determine which free job to schedule so as to maximize the total expected reward accrued for the completion of all jobs. Such problems arise in diverse application areas, e.g. scheduling of patients for medical procedures, supply chains of perishable goods, packet s…
KAIST(韩国科学技术院);London School of Economics(伦敦政治经济学院)
We study a single-server scheduling problem for the objective of minimizing the expected cumulative holding cost incurred by jobs, where parameters defining stochastic job holding costs are unknown to the scheduler. We consider a general setting allowing for different job classes, where jobs of the same class have statistically identical holding costs and service times, with an arbitrary number of jobs across classes. In each time step, the server can process a job and observes random holding costs of the jobs that are yet to be completed. We consider a learning-based $cμ$ rule scheduling whic…
Scheduling to minimize mean response time in an M/G/1 queue is a classic problem. The problem is usually addressed in one of two scenarios. In the perfect-information scenario, the scheduler knows each job's exact size, or service requirement. In the zero-information scenario, the scheduler knows only each job's size distribution. The well-known shortest remaining processing time (SRPT) policy is optimal in the perfect-information scenario, and the more complex Gittins policy is optimal in the zero-information scenario. In real systems the scheduler often has partial but incomplete information…
In this article, we study a single-machine scheduling problem of minimizing the total tardiness for a set of independent jobs. The processing time of a job is modeled as a step function of its starting time and a specific deteriorating date. A mixed integer programming model was applied to the problem and validated. Since the problem is known to be NP-hard, we proposed a heuristic named simple weighted search procedure (SWSP) and a general variable neighborhood search algorithm (GVNS). A perturbation procedure with 3-opt is embedded within the GVNS process in order to explore broader spaces. E…
In manufacturing, the production is often done on out-of-the-shelf manufacturing lines, whose underlying scheduling heuristics are not known due to the intellectual property. We consider such a setting with a black-box job-shop system and an unknown scheduling heuristic that, for a given permutation of jobs, schedules the jobs for the black-box job-shop with the goal of minimizing the makespan. Here, the jobs need to enter the job-shop in the given order of the permutation, but may take different paths within the job shop, which depends on the black-box heuristic. The performance of the black-…
In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs is the worst-case objective function value from the set of all possible realizations of release and processing times. The objective function value is the total flow time of all jobs. We discuss some important properties of robust schedules for zero and non-zero release times, and illustrate the added complexity in robust scheduling given non-zero release time…
We study the design of dynamic scheduling controls in closed queueing networks with a fixed number of jobs. Each time a server becomes available, the controller has (limited) flexibility in choosing the buffer from which to serve a job. If no jobs are available at any compatible buffer, the server idles. If the job is served, it relocates to a ``destination'' buffer. We study how to maximize throughput in steady state via a large deviations analysis. We propose a family of simple state-dependent policies called Scaled MaxWeight (SMW) policies that dynamically manage the distribution of jobs in…
We propose a Boolean Linear Programming model for the preemptive single machine scheduling problem with equal processing times, arbitrary release dates and weights(priorities) minimizing the total weighted completion time. Almost always an optimal solution of the Linear Programming relaxation is integral and can be straightforwardly converted into an optimal schedule. To deal with the fractional solutions we present two heuristics. Very often our heuristics find solutions with objective function values equal to the lower bound found by the Linear Programming relaxation. For the cases when uppe…
This article considers the parallel machine scheduling problem with step-deteriorating jobs and sequence-dependent setup times. The objective is to minimize the total tardiness by determining the allocation and sequence of jobs on identical parallel machines. In this problem, the processing time of each job is a step function dependent upon its starting time. An individual extended time is penalized when the starting time of a job is later than a specific deterioration date. The possibility of deterioration of a job makes the parallel machine scheduling problem more challenging than ordinary o…
We consider the weighted completion time minimization problem for capacitated parallel machines, which is a fundamental problem in modern cloud computing environments. We study settings in which the processed jobs may have varying duration, resource requirements and importance (weight). Each server (machine) can process multiple concurrent jobs up to its capacity. Due to the problem's $\mathcal{NP}$-hardness, we study heuristic approaches with provable approximation guarantees. We first analyze an algorithm that prioritizes the jobs with the smallest volume-by-weight ratio. We bound its approx…
We consider a single server queueing system with two classes of jobs: eager jobs with small sizes that require service to begin almost immediately upon arrival, and tolerant jobs with larger sizes that can wait for service. While blocking probability is the relevant performance metric for the eager class, the tolerant class seeks to minimize its mean sojourn time. In this paper, we discuss the performance of each class under dynamic scheduling policies, where the scheduling of both classes depends on the instantaneous state of the system. This analysis is carried out under a certain fluid limi…
Minimizing the Weighted Number of Tardy Jobs: Data-Driven Heuristic for Single-Machine Scheduling
Czech Technical University in Prague, Faculty of Electrical Engineering(布拉格捷克技术大学电子工程学院);Czech Technical University in Prague, CIIRC(布拉格捷克技术大学计算机与信息研究学院)