从空载光达、地面LiDAR和运动多视图立体结构模拟风成沙丘
Aeolian dune modelling from airborne LiDAR, terrestrial LiDAR and Structure from Motion-Multi View Stereo
摘要:
巴西南部沙丘的DEM是由RPA在2019年2月拍摄的810张照片生成的。SfM-MVS DEM的高度精度通过与RPA飞行的同一实地考察活动期间收集的陆地激光雷达(TLS)数据进行比较进行了验证。然后将SfM-MVS DEM与2010年10月的空载光达(ALS)DEM进行比较。虽然SfM-MVS和TLS DEM非常相似,但SfM-MVS DEM呈现TLS DEM中不可见的小尺度表面粗糙度。将特征保持DEM平滑(FPD)算法应用于SfM-MVS DEM,在表面平滑方面具有良好的结果,但在描述性统计和误差度量方面没有任何显著变化,原始和FPD过滤DEM的RMSE为0.08 m,MAE为0.06 m。ALS和SfM-MVS DEM的沙丘波峰线位移导致2010年至2019年的迁移率约为5 m/年,这与从卫星图像和同一地区的历史航空照片得出的比率非常一致。同期沙量变化仅减少0.2%,这可能与安装沙栅栏促进沙丘稳定以及沙丘场前部的沙子清除以保持道路对车辆开放有关。ALS可以在很短的时间内覆盖大片区域,但其高昂的成本仍然是更广泛使用的障碍,特别是发展中国家的研究人员。TLS具有中间成本,但需要更多的现场工作和更多的处理时间。在我们的案例中,我们需要三天的时间进行TLS调查,大约三周的时间来制作约80400 m2的DEM。另一方面,我们能够在不到三小时的时间内完成六次飞行任务,覆盖约740900平方米,在中程工作站的处理时间约为13小时。这使得SfM-MVS成为一种低成本的解决方案,可快速可靠地进行海岸沙丘的三维建模和连续监测。
英文摘要:
A DEM of a dunefield in Southern Brazil was generated from 810 photos captured by an RPA in February 2019. Altimetric accuracy of the SfM-MVS DEM was validated by comparison with Terrestrial LiDAR (TLS) data collected during the same fieldwork campaign of the RPA flights. The SfM-MVS DEM was then compared to an Airborne LiDAR (ALS) DEM from October 2010. While the SfM-MVS and TLS DEMs are very similar, the SfM-MVS DEM presents a small scale surface roughness not visible in the TLS DEM. The Feature Preserving DEM Smoothing (FPD) algorithm was applied to the SfM-MVS DEM with good results in terms of surface smoothing, but without any significant changes in descriptive statistics and error metrics, with an RMSE of 0.08m and MAE of 0.06m for both the original and the FPD-filtered DEM. Displacement of dune crest lines from the ALS and SfM-MVS DEMs resulted in a migration rate of ~5m/year between 2010 and 2019, in good agreement with rates derived from satellite images and historical aerial photographs of the same area. Sand volume change in the same period showed a decrease of only 0.2%, which can be related to the installation of sand fences to promote dune stabilization and sand removal from the front of the dune field to keep a road open to vehicles. ALS can cover large areas in little time but its high cost still remains a barrier to wider usage, especially by researchers in developing countries. TLS has an intermediate cost but demands more fieldwork and more processing time. In our case we needed three days for the TLS survey and around three weeks to produce a DEM of ~80400m2. On the other hand, we were able to cover ~740900m2 with six flight missions in under three hours, with ~13 hours processing time in a medium-range workstation. This makes SfM-MVS a low-cost solution with fast and reliable results for 3D modelling and continuous monitoring of coastal dunes.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。