GPU加速的生物质生产物流优化,多台收割机同时运行,参观田地和工厂
GPU-accelerated Logistics Optimisation for Biomass Production with Multiple Simultaneous Harvesters Tours, Fields and Plants
摘要:
在生物质生产的背景下,本文提出了一种物流优化的方法。从一个总部开始,多个巡回将由收获单元(HU)和支持单元(SU)组同时执行,以首先从多个农田收获生物质,然后通过穿梭SU将生物质供应给多个沼气厂(BP)。这一问题在更大范围内是相关的,特别是对承包商而言。该问题是复杂的,因为存在三个互连的优化水平:(i)将BP分配给行程以及将BP分配给每个行程的排序,(ii)将字段分配给BP以及将字段分配给每个BP的排序,以及(iii)确定分配给每个行程的HU和SU的数量,由此不同的HU和SU通常可以具有不同的工作速率和负载能力。问题建模和解决方法进行了讨论。对于后者,提出了一种GPU加速的启发式搜索算法。对于前者,最小化总累计路径长度和最大完成时间在所有收割机旅游,嵌入式本地最小化的分配SU旅游,和需求满足约束的BP的优化标准进行了讨论。在随机模拟实验中发现,允许无约束的分配任何可用的领域,承包商服务于任何可用的BP,独立于他们的owerweight,是至关重要的(i),以达到最大的路径长度节省,(ii)也是最好的平衡和最小化的统一完成时间在所有的收割机旅游,使天气依赖的收获窗口可以被最佳地利用。
英文摘要:
Within the context of biomass production, this paper proposes a method for logistics optimisation. Starting from a headquarter multiple tours are to be executed simultaneously by groups of harvesting units (HUs) and support units (SUs) to first harvest biomass from multiple agricultural fields, before supplying the biomass to multiple biogas plants (BPs) via shuttling SUs. This problem is relevant on a larger scale in particular for contractors. This problem is complex since there are three interconnected optimisation levels: (i) the assignment of BPs to tours and the ordering of BPs assigned to each tour, (ii) the assignment of fields to BPs and the ordering of fields assigned to each BP, and (iii) determining the number of HUs and SUs assigned to each tour, whereby different HUs and SUs may in general have different working rates and loading capacities. Problem modeling and a solution method are discussed. For the latter, a GPU-accelerated heuristic search algorithm is proposed. For the former, an optimisation criterion minimising both total accumulated path length and the maximum completion time over all harvesters tours, an embedded local minimisation for the assignment of SUs to tours, and demand fulfilment constraints for BPs are discussed. In stochastic simulation experiments it is found that permitting unconstrained assignment of any available field that a contractor services to any available BP, independent of their ownerships, is crucial (i) to attain maximum path length savings, and (ii) also to best balance and minimise uniform completion times over all harvesters tours such that weather-dependent harvesting windows can be exploited optimally.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。