低碳能源系统模型中输电网规划的启发式方法
Heuristics for Transmission Expansion Planning in Low-Carbon Energy System Models
摘要:
世界各国政府正在计划增加可再生能源在其能源系统中的份额。新的风能和太阳能发电厂的选址需要与电网规划密切协调,因此在空间和时间上解决的模型中,发电和输电扩展投资的共同优化是一个不可或缺但复杂的问题。特别是考虑输电扩展规划(TEP)增加了问题的复杂性。即使将潮流方程线性化,由于线路扩展对线路阻抗的依赖性和线路扩展选项的离散集,最优化问题仍然是双线性和混合整数。虽然可以通过应用大M析取松弛来线性化该混合整数非线性规划(MINLP),但是所得到的MILP仍然难以使用用于大规模能源系统模型的最先进的求解器来求解。因此,在本文中,我们开发了将整数传输扩展和响应线阻抗的能源系统模型,同时保留了较低的计算工作量的连续线性规划(LP)应用顺序线性规划(SLP)技术,松弛和离散化途径。我们基准测试他们的性能对德国传输系统的政策相关的案例研究的精确制定的结果,在他们的计算时间的加速,偏离最佳的总系统成本,和线路扩展的相似性。使用优化,我们减少了82%的联合发电和传输优化的计算时间,最大的总系统成本偏差只有1.5%。该算法紧密反映了精确MINLP的最优整数线路投资,为政策相关的低碳能源系统最优化模型节省了大量时间。
英文摘要:
Governments across the world are planning to increase the share of renewables in their energy systems. The siting of new wind and solar power plants requires close coordination with grid planning, and hence co-optimization of investment in generation and transmission expansion in spatially and temporally resolved models is an indispensable but complex problem. Particularly considerations of transmission expansion planning (TEP) add to the problem's complexity. Even if the power flow equations are linearized, the optimization problem is still bilinear and mixed-integer due to the dependence of line expansion on line impedance and a discrete set of line expansion options. While it is possible to linearize this mixed-integer nonlinear program (MINLP) by applying a big-M disjunctive relaxation, the resulting MILP is still hard to solve using state-of-the-art solvers for large-scale energy system models. In this paper we therefore develop heuristics to incorporate integer transmission expansion and responsive line impedances in energy system models, while retaining the lower computational effort of continuous linear programming (LP) by applying sequential linear programming (SLP) techniques, relaxation and discretization approaches. We benchmark their performance against the results of the exact formulation for a policy-relevant case study of the German transmission system in terms of their speed-up in computation time, deviation from optimal total system cost, and similarity of line expansion. Using heuristics we reduce computation times of joint generation and transmission optimisation by 82% with a maximal total system cost deviation of only 1.5%. The heuristics closely mirror optimal integer line investment of the exact MINLP with considerable time savings for policy-relevant low-carbon energy system optimization models.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。