带任务划分的装配线平衡
Assembly line balancing with task division
摘要:
在简单装配线平衡问题(SALBP-1)的一个常用版本中,任务被分配给装配线上的工作站,并具有固定的周期时间,以最小化所需的工作站数量。传统上认为,每个产品单元所需的总工作已被划分为经济上不可分割的任务。然而,在实践中,有时可能以额外的时间惩罚成本以有限的方式划分特定任务。尽管有处罚,任务分工在可能的情况下,现在,然后导致减少最低数量的站。决定哪些允许的任务划分创建一个新的装配线平衡问题,TDALBP(任务划分装配线平衡问题)。我们提出了一个数学模型的TDALBP,一个精确的求解过程,它和一些经典的SALBP实例从研究文献的适应目前有前途的计算结果。结果表明,TDALBP有时有潜力显着提高装配线的性能。
英文摘要:
In a commonly-used version of the Simple Assembly Line Balancing Problem (SALBP-1) tasks are assigned to stations along an assembly line with a fixed cycle time in order to minimize the required number of stations. It has traditionally been assumed that the total work needed for each product unit has been partitioned into economically indivisible tasks. However, in practice, it is sometimes possible to divide particular tasks in limited ways at additional time penalty cost. Despite the penalties, task division where possible, now and then leads to a reduction in the minimum number of stations. Deciding which allowable tasks to divide creates a new assembly line balancing problem, TDALBP (Task Division Assembly Line Balancing Problem). We propose a mathematical model of the TDALBP, an exact solution procedure for it and present promising computational results for the adaptation of some classical SALBP instances from the research literature. The results demonstrate that the TDALBP sometimes has the potential to significantly improve assembly line performance.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。