arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1812.04787eess.SYcs.SY
收藏

2017年新英格兰电力系统运营分析与可再生能源整合研究(SOARES)

The 2017 ISO New England System Operational Analysis and Renewable Energy Integration Study (SOARES)

Thayer School of Engineering at Dartmouth(达特茅斯学院泰勒工程学院)

Aramazd Muzhikyan, Steffi O. Muhanji, Galen Moynihan, Dakota J. Thompson, Zachary M. Berzolla, Amro M. Farid

AI总结:

本文研究了新英格兰电力系统在可再生能源整合方面的变化,通过分析不同发电混合场景对正常运行储备的影响,揭示了高可再生能源渗透率下运行储备的消耗和削减需求。

摘要:

新英格兰的 bulk electric power system 正在发生根本性的变化。核能、燃煤和石油发电设施的表示将大幅下降,而天然气、风能和太阳能设施将填补其位置。然而,引入变量能源资源(VERs)如太阳能和风能,却需要对电力电网的动态运行进行根本性的改变。VERs的预测不确定且其曲线是间歇性的,因此需要更多的运行储备。本文描述了2017年ISO新英格兰系统运营分析与可再生能源整合研究(SOARES)的方法论和关键发现。该研究由ISO新英格兰的利益相关者委托,以研究不同发电混合场景对正常运行储备的影响。该项目使用了称为电力企业控制系统(EPECS)的综合评估方法进行。EPECS从物理电力电网及其多层控制包括承诺决策、经济调度和调节服务来表征一个电力系统。本文提供了变量能源资源和运行储备的精确定义。它还包含日间资源调度、同一天资源调度、实时平衡操作和调节服务的详细模型。在关键发现中,报告显示,高可再生能源渗透率的场景在一年中部分时间耗尽了运行储备,并且所有场景都会削减半可调度资源,以补充运行储备并缓解系统的一些拓扑限制。总体而言,削减成为关键的平衡性能控制杠杆,存在明显需要更高运行储备的需求。

英文摘要:

The bulk electric power system in New England is fundamentally changing. The representation of nuclear, coal and oil generation facilities is set to dramatically fall, and natural gas, wind and solar facilities will come to fill their place. The introduction of variable energy resources (VERs) like solar and wind, however, necessitates fundamental changes in the power grid's dynamic operation. VER forecasts are uncertain and their profiles are intermittent thus requiring greater quantities of operating reserves. This paper describes the methodology and the key findings of the 2017 ISO New England System Operational Analysis and Renewable Energy Integration Study (SOARES). This study was commissioned by the ISO New England stakeholders to investigate the effect of several scenarios of varying generation mix on normal operating reserves. The project was conducted using the holistic assessment approach called the Electric Power Enterprise Control System (EPECS) simulator.The EPECS characterizes a power system in terms of the physical power grid and its multiple layers of control including commitment decisions, economic dispatch, and regulation services. This paper provides precise definitions of how variable energy resources and operating reserves are modeled. It also includes detailed models of the day-ahead resource scheduling, the same-day resource scheduling, the real-time balancing operations and the regulation service. Among the key findings, the reports shows that scenarios with high penetrations of VERs exhaust their operating reserves for part of the year and all scenarios curtail semi-dispatchable resources both to complement operating reserves and to mitigate some of the topological limitations of the system. Overall, curtailment emerges as a key balancing performance control lever and there is a clear need for higher amounts of operating reserves.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑