p循环的冲击区分析
Impact Zone Analysis of p-Cycle
摘要:
预配置周期(p-Cycle)方法在光网络保护中得到了广泛的研究。大的p-循环具有高容量效率,并且可以保护大量节点免受单链路故障场景的影响。当在故障之后消耗p周期以恢复业务时,由这样的p周期保护的所有链路失去保护。由于多链路故障的概率对于大型网络是高的,这也意味着在较高的概率下,在第二次故障时,可能不存在针对故障链路的保护。因此,如果由p-循环保护的链路的数目大,则在第二故障出现时,它使得网络以高概率不受保护。在本文中,我们研究了p-循环的各种配置中第一个链路故障引起的影响区。该研究提供了洞察如何选择的p周期配置,以减少影响区,同时使用最小的备用容量。我们提出了几种方法,并比较它们,以显示如何影响区分析可以用来提高光网络中的容错。
英文摘要:
Pre-configured cycle (p-Cycle) method has been studied in literature extensively for optical network protection. A large p-cycle has high capacity efficiency and can protect a large number of nodes against the single link failure scenarios. All the links protected by such a p-cycle lose protection when the p-cycle is consumed to restore traffic after a failure. As the probability of multiple link failure is high for a large network, it also means that with higher probability, on the second failure, protection may not be there for the failed link. Thus, if the number of links protected by a p-cycle is large, it makes the network unprotected with high probability on the advent of the second failure. In this paper, we study the impact zone due to a first link failure in the various configurations of the p-cycles. The study gives insight into how to choose the p-cycle configuration to reduce the impact zone while using minimum spare capacity. We propose few methods and compare them to show how the impact zone analysis can be used to improve the fault tolerance in an optical network.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。