arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1806.02825stat.APcs.LGstat.ML
收藏

基于Zero Shot马尔可夫模型的大型铁路网训练延误估计

Estimating Train Delays in a Large Rail Network Using a Zero Shot Markov Model

Nutanix Technologies India Pvt Ltd(Nutanix 印度私人有限公司);IBM T J Watson Research Center, USA(美国 IBM T J 沃森研究中心)

Ramashish Gaurav, Biplav Srivastava

摘要:

印度拥有世界第四大铁路运输网络,每年运送乘客超过80亿人次。然而,乘客的旅行经历经常以延误为标志,即,列车晚点进站,造成不便。在第一,我们研究了系统的延迟训练到达使用n阶马尔可夫框架和实验两个回归模型。利用两年来收集的训练运行状态数据,我们报告了一个有效的算法,估计在火车站的延误与近准确的结果。这项工作可以帮助铁路管理其资源,同时也帮助乘客和他们所服务的企业有效地规划他们的活动。

英文摘要:

India runs the fourth largest railway transport network size carrying over 8 billion passengers per year. However, the travel experience of passengers is frequently marked by delays, i.e., late arrival of trains at stations, causing inconvenience. In a first, we study the systemic delays in train arrivals using n-order Markov frameworks and experiment with two regression based models. Using train running-status data collected for two years, we report on an efficient algorithm for estimating delays at railway stations with near accurate results. This work can help railways to manage their resources, while also helping passengers and businesses served by them to efficiently plan their activities.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑